Log in
Forum
Topic

Material Recovery Facility- Requirement Area

CS-2009 MRp1: Storage and Collection of Recyclables
posted by John Raymond Dimailig on Feb 12, 2018, 1:01 am

Hi Ma'am/Sir,

Our project has three towers and shares one podium. There are three proposed recycling areas but too small to comply the leed requirement. But if the areas were sum up, it...

Direct vs Indirect Lighting Strategy A- does Guidance illustration comply?

Retail-NC-v4 EQc6: Interior lighting
posted by Joyce Kelly on Feb 12, 2018, 12:24 pm

The illustration used for Strategy A under Guidance for Direct vs Indirect Lighting includes a Luminance diagram with 11,286 cd/m2 at 45 deg. and 0 above this mark. Does a...

LEED EBOM for a Single Tenant Building

Warehouses-EBOM-v4 MPR1: Must be in a permanent location on existing land
posted by Bernardo Frias Bouchez on Feb 14, 2018, 1:54 pm

Dear all,

We have a prospect client who is interested in certifying his Light Industrial building of 40,000 m2. 

Since he is the owner, he has a single tenant and he would like to...

Faucets of Medical consult

Healthcare-v2009 MRc4.2: PBT source reduction - lead, cadmium and copper
posted by Victor Moreno on Feb 15, 2018, 5:47 am

The faucets of Medical consult (Exam-treatament space) are considered for water intended for human consumption?

Thanks

LEED ND v4 MPR2 project area

ND-v4 MPR2: Must use reasonable LEED boundaries
posted by wenting ding on Feb 18, 2018, 8:04 pm

We are considering applying for a LEED ND cergification. In the minimum program requirements, it is writter'projects may have enclaves of non-project properties that are not subject to the rating...

Thermal Comfort- Mechancial Ventilated Warehouse Space

NC-2009 IEQc7.1: Thermal comfort - design
posted by Vinoth Muthusamy on Feb 21, 2018, 5:17 am

Dear All,

We are working on a warehouse project (LEED NC 2009), that has box type Mechanical Ventilation fans which comply minimum & enhanced ventilation. To comply thermal comfort...

No MERV 13 in minor occupancy area

CS-v4 EQc1: Enhanced indoor air quality strategies
posted by sompoche sirichote on Feb 21, 2018, 5:48 am

Hi,

Our project is a high-rise office tower with a small podium in front of the project. Our office tower has 55 storey. The podium is open air space where has small enclosed retail and...

Defining a product

Pilot-Credits MRpc52: Material multi-attribute assessment
posted by Xavi Ramon on Feb 21, 2018, 7:23 am

Dear Mr Mrs,

I would like to know if for pilot credit Material multi-attribute assessment in LEEDC&S v3, should I take into account different products selection as is mentioned in LEED...

EBOM templates

Pilot-Credits IPpc88: LEED O+M Starter Kit
posted by Pia Öhrling on Feb 21, 2018, 9:19 am

The EBOM templates...

water consumption calculations for Irrigation

CS-2009 WEc1: Water Efficient Landscaping
posted by Selvarasu M on Feb 26, 2018, 4:30 am

Hi,

The following are the queries with respect to irrigation calculations:

1. While calculating the area of trees, do we have to consider the area of the trunk or the fully grown...