Forum quick links
Unconditioned building envelope
NC-2009 EAp2:Minimum Energy Performanceposted by Luana Bertoletti on
Hi, I have a doubt on how to model unconditioned spaces envelope.
On/Off Switch in Locker Rooms
NC-2009 IEQc6.1:Controllability of Systems—Lightingposted by Charline SEYTIER on
Our design is composed of occupancy sensors in large Locker rooms of a manufacturing plant but they apparently may not be enough to comply with the credit requirements. We suggested to the client
Compliance
Healthcare-v2009 IEQp1:Minimum indoor air quality performanceposted by Alicia Neubauer on
We have a project that just went through Preliminary Design Review.
Chemical Labs
NC-2009 IEQc6.1:Controllability of Systems—Lightingposted by Saju Varghese on
Do chemical labs need to comply with this credit?
C&S ventilation
CS-2009 IEQp1:Minimum IAQ Performanceposted by Randy Cook on
Hello. I'm working on a C&S project and have a question regarding the documentation of the IEQp1 credit. During the design a single tenant was found to occupy the entire site (700k sf).
Breathing zone ventilation
NC-2009 IEQp1:Minimum IAQ Performanceposted by Rudolph Carneiro on
Must Vbz be met for all zones in a multizone system? Section 6.2 states that the VRP procedure is for determining Vot and not Vbz.
One building, two certificates?
posted by Anthea Ng on
E.g. a project has a building which includes Hotel and offices.
2 Pipe Fan Coil System
NC-2009 EAc1:Optimize Energy Performanceposted by Donald Green on
We have a project where the team came to us after the fact and are asking about LEED certification. They have already installed a 2 pipe fan coil system.
More option D vs option B
NC-2009 EAc5:Measurement and Verificationposted by Thomas Huang on
Thank you for this very helpful forum. I have read every comment on EAc5 as I prepare to submit our first M&V plan.
Content of mechanical schedule
NC-2009 PIf4:Schedule and Overview Documentsposted by Michael Haugeneder on
Does the requirement for PIf4: mechanical schedule refer to the provision of MEP plans or simply to HVAC plans?