Topic | Recent |
---|---|
DES Option 2NC-2009 EAc1: Optimize Energy Performanceposted by BH . on Jun 2, 2014, 7:42 am
We are dealing with the project served by... Last reply: BH ., Jun 3, 2014, 10:42 am |
|
Framed assembly U-value calculated by WinISO 2D SoftwareNC-2009 EAp2: Minimum Energy Performanceposted by Mayank Bhatnagar on Jun 3, 2014, 4:46 am
Hi, Last reply: Agnieszka Rylska, Nov 30, 2015, 7:01 am |
|
Electric instantaneous water heaterNC-2009 EAp1: Fundamental Commissioning of Building Energy Systemsposted by CT G on Jun 3, 2014, 11:47 am
Hi, The design team is specifying an electric instantaneous water heater on a project we are working with. The project is located in Argentina. Does this kind of water heater have... Last reply: Scott Bowman, Jul 7, 2014, 6:08 pm |
|
Distributors location for MR c5NC-2009 MRc5: Regional Materialsposted by María Fernanda Aguirre on Jun 12, 2014, 5:11 pm
Hi there! Last reply: Keith Lindemulder, Jan 30, 2015, 6:28 pm |
|
Using ASHRAE Figure 5.2.1.1.NC-2009 IEQc7.1: Thermal comfort - designposted by Nelina Loiselle on Jun 12, 2014, 7:07 pm
On past project we have been told: Please note that Figure 5.2.1.1 can only be used when air speeds are less than 40 feet per minute. We have a project with air speeds at 40 fpm. So does... Last reply: Nelina Loiselle, Jun 16, 2014, 11:43 am |
|
EA Pr-1, EB O&MEBOM-2009 EAp1: Energy efficiency best management practices - planning, documentation and opportunity assessmentposted by Shelendra Kumar on Jun 13, 2014, 5:47 am
Hi, Last reply: Dave Hubka, Jun 17, 2014, 3:26 pm |
|
Documenting On Site Water ReuseNC-2009 WEp1: Water Use Reductionposted by Saud Abdul Rasheed on Jun 14, 2014, 8:35 am
Hello All, In our Project we are installing a Water Treatment Plant where we are collecting grey water from sinks as well as capturing rain water and treating them and using them in the... Last reply: Saud Abdul Rasheed, Jun 16, 2014, 8:38 am |
|
Accept preliminary construction review as finalLEED Reviews: Appeals, Design/Construction Submittals, and moreposted by Charalampos Giannikopoulos on Jun 18, 2014, 6:06 pm
After the preliminary construction review we have been awarded all prerequisites and a specific amount of points. The project team does not intend to aplly for a final construction review,... Last reply: Tiffany Beffel, Oct 21, 2019, 5:57 am |
|
New Construction- ELODIE ToolNC-v4 MRc1: Building life-cycle impact reductionposted by Ian McCall on Jun 30, 2014, 7:27 am
Hello, Last reply: Julien Richard, Oct 19, 2016, 9:43 am |
|
Fire-retardant coatingsNC-2009 IEQc4.2: Low-emitting materials - paints and coatingsposted by Mike D on Jul 7, 2014, 10:29 am
The table on LEED online does not provide with the option for fire-retardant coatings. What other category should be used and what is the... Last reply: Len Sciarra, Oct 2, 2015, 7:33 pm |