Topic | Recent |
---|---|
Phases of constructionSchools-2009 MPR2: Must be a complete, permanent building or spaceposted by Cindy Quinn on Mar 1, 2017, 12:41 pm
I have a situation where an owner is planning phased construction. It is possible, but not definite that both phases will be complete at the time of LEED certification. If Phase 2 is 40% or... |
|
pilot closurePilot-Credits MRpc52: Material multi-attribute assessmentposted by Batya Metalitz on Mar 2, 2017, 11:13 am
Based on MR... |
|
pilot closurePilot-Credits MRpc76: Material ingredient reportingposted by Batya Metalitz on Mar 2, 2017, 11:14 am
Based on MR... |
|
moving to innovation catalog on 3/15/2017Pilot-Credits MRpc53: Responsible sourcing of raw materialsposted by Batya Metalitz on Mar 2, 2017, 11:18 am
Based on MR... |
|
moving to innovation catalog on 3/15/2017Pilot-Credits MRpc61: Material disclosure and assessmentposted by Batya Metalitz on Mar 2, 2017, 11:18 am
Based on MR... |
|
moving to innovation catalog on 3/15/2017Pilot-Credits MRpc77: Material ingredient optimizationposted by Batya Metalitz on Mar 2, 2017, 11:19 am
Based on MR... |
|
moving to innovation catalog on 3/15/2017Pilot-Credits MRpc79: Material ingredients product manufacturer supply chain optimizationposted by Batya Metalitz on Mar 2, 2017, 11:19 am
Based on MR... |
|
Overlapping LEED boundaries-connecting new to existing LEED BLDGHealthcare-v2009 MPR3: Must use a reasonable site boundaryposted by Punit Jain on Mar 2, 2017, 4:13 pm
I am working on a LEED certification for a new building that is attached via a small circulation bridge to an existing LEED-Certified building on a college campus. The new project crosses the... |
|
Campus Credit- LandscapeNC-2009 SSc5.1: Site development - protect or restore habitatposted by SAMY Chamy on Mar 6, 2017, 4:37 am
Our Project is a Campus Project with 4 registered buildings for LEED. The ground cover landscape didn't not meet the SS C5.1 requirement. So we opted for Roof Garden on one of the buildings. We... |
|
LEED v2009 CS+ID PointCS-2009 IDc1: Innovation in Designposted by Britt Valdez on Mar 8, 2017, 12:14 pm
In seeking IDc1 Innovation and Design point for LEED CS v2009, would the purchase of carbon offsets to reduce natural gas emissions be acceptable in achieving the ID point? If so, what... |