Log in
Forum
Topic

Phases of construction

Schools-2009 MPR2: Must be a complete, permanent building or space
posted by Cindy Quinn on Mar 1, 2017, 12:41 pm

I have a situation where an owner is planning phased construction. It is possible, but not definite that both phases will be complete at the time of LEED certification. If Phase 2 is 40% or...

pilot closure

Pilot-Credits MRpc52: Material multi-attribute assessment
posted by Batya Metalitz on Mar 2, 2017, 11:13 am

Based on MR...

pilot closure

Pilot-Credits MRpc76: Material ingredient reporting
posted by Batya Metalitz on Mar 2, 2017, 11:14 am

Based on MR...

moving to innovation catalog on 3/15/2017

Pilot-Credits MRpc53: Responsible sourcing of raw materials
posted by Batya Metalitz on Mar 2, 2017, 11:18 am

Based on MR...

moving to innovation catalog on 3/15/2017

Pilot-Credits MRpc61: Material disclosure and assessment
posted by Batya Metalitz on Mar 2, 2017, 11:18 am

Based on MR...

moving to innovation catalog on 3/15/2017

Pilot-Credits MRpc77: Material ingredient optimization
posted by Batya Metalitz on Mar 2, 2017, 11:19 am

Based on MR...

moving to innovation catalog on 3/15/2017

Pilot-Credits MRpc79: Material ingredients product manufacturer supply chain optimization
posted by Batya Metalitz on Mar 2, 2017, 11:19 am

Based on MR...

Overlapping LEED boundaries-connecting new to existing LEED BLDG

Healthcare-v2009 MPR3: Must use a reasonable site boundary
posted by Punit Jain on Mar 2, 2017, 4:13 pm

I am working on a LEED certification for a new building that is attached via a small circulation bridge to an existing LEED-Certified building on a college campus. The new project crosses the...

Campus Credit- Landscape

NC-2009 SSc5.1: Site development - protect or restore habitat
posted by SAMY Chamy on Mar 6, 2017, 4:37 am

Our Project is a Campus Project with 4 registered buildings for LEED. The ground cover landscape didn't not meet the SS C5.1 requirement. So we opted for Roof Garden on one of the buildings. We...

LEED v2009 CS+ID Point

CS-2009 IDc1: Innovation in Design
posted by Britt Valdez on Mar 8, 2017, 12:14 pm

In seeking IDc1 Innovation and Design point for LEED CS v2009, would the purchase of carbon offsets to reduce natural gas emissions be acceptable in achieving the ID point? If so, what...