EAc1 required 2 points

CI-2009 EAp2: Minimum Energy Performance
posted by Jennifer Berthelot-Jelovic on Mar 22, 2011, 3:41 pm

I know that for EAc1 there was a requirement that "All LEED for New Construction project registered after June 26, 2007 are required to achieve at least two (2) points." Since I am working on a...

Last reply: David Hubka, Mar 23, 2011, 5:05 pm

Design Engineer Signatory

CI-2009 EAp2: Minimum Energy Performance
posted by Sundararaj Subburaman on Mar 23, 2011, 3:11 am

Please let me know if the HVAC Designer will be representing the Design Engineer Signatory for the EA P2? If not who will be the Design Engineer - MEP designer?

Last reply: David Hubka, Mar 23, 2011, 5:00 pm

Credit 3.2, Option 1, Path 2

NC-2009 IEQc3.2: Construction IAQ management plan - before occupancy
posted by Douglas Blakeslee on Mar 21, 2011, 4:35 pm

We are the...

Last reply: David Hubka, Mar 23, 2011, 10:02 am

Supplemental Documents

General forums
posted by David Eldridge on Mar 22, 2011, 9:46 pm

If your normal process was to generate letter size documents for the project, then I don't see why...

Hotel with a Conference Center and EnergyStar

EBOM-2009 EAp2: Minimum Energy Efficiency Performance
posted by Jalal Avades on Nov 11, 2010, 6:07 pm

My project(s) is a Hotel Building with an adjacent Conference Center those are connected by a Tunnel.

The Central Plant which house the chillers, heating hot water boilers, domestic hot...

Last reply: Jalal Avades, Mar 22, 2011, 2:15 pm

Commissioning process in a volume program

General forums
posted by Emmanuel Pauwels on Mar 22, 2011, 1:00 pm

After reading the documentation about the LEED Volume program, I understand that it is essential to implement a quality control plan in order to ensure that the certified prototype will be...

Last reply: Tristan Roberts, Mar 22, 2011, 1:29 pm

CxA in international project

NC-2009 EAp1: Fundamental Commissioning of Building Energy Systems
posted by Armen Khachikyan on Mar 18, 2011, 5:37 am

Recently one LEED AP said that to make appropriate comissioning...

Last reply: Armen Khachikyan, Mar 21, 2011, 5:15 pm

2004 GSA Report on Cost of LEED

Understanding the Cost of LEED-NC Project Certification
posted by Barbara McCrary on Dec 23, 2010, 3:41 pm

The General Services Administration (GSA) also has a very helpful study they published in 2004 on the cost of LEED in GSA projects. It's a bit dated but is also helpful in getting a rough idea on...

Last reply: Sayeed Muhammad, Mar 21, 2011, 11:27 am

duplication with EA Credit 5?

Pilot-Credits PC26: Advanced Energy Metering
posted by Melissa Merryweather on Mar 19, 2011, 9:53 pm

Its not super-clear to me whether we could pursue BOTH EA Credit 5 and this Pilot Credit. Would appreciate your comment on this.

Last reply: Melissa Merryweather, Mar 21, 2011, 10:45 am

documentation of adjustable flowrates

CS-2009 WEp1: Water Use Reduction
posted by Florian Schmidtchen on Nov 25, 2010, 3:23 am

Has anyone experience with the documentation of adjustable flowrates?
Some fixtures like faucets and showerheads can be adjusted to a lower flowrate, however the spec sheet only shows a...

Last reply: Karen Blust, Mar 21, 2011, 2:03 am