Post a question or comment
Filter by location
Forum
Topic
Replies
Recent

Project partially sold after certifcation

General forums
posted by  Tim Habraken  on 

A project (consisting of four separate buildings on a shared parking garage) will be certified according to v2009 NC.

3
Mon Feb 10, 2014, 6:17 pm

Using the 62MZ calculator

EBOM-2009 IEQp1:Minimum IAQ Performance
posted by  Christina Reeves  on 

Hello, I have two questions from our ME about using the spreadsheet calculator: 1. Neither of us can get the macros to work on the calculator - to add zones, etc.

3
Default Avatar
President
Weatherby Design & Co. Engineers
LEEDuser Basic Member
67 thumbs up
Mon Feb 10, 2014, 5:45 pm
2
Representative
Vermont House of Representatives
LEEDuser Expert
7780 thumbs up
Mon Feb 10, 2014, 3:27 pm

Climate zone in Copenhagen, Denmark

NC-2009 EAc1:Optimize Energy Performance
posted by  Lise Dannesboe  on 

Our office building is placed in Copenhagen, Denmark. Our question is which climate zone to use?

2
LEED Fellow
7group / Energy Opportunities
LEEDuser Expert
4454 thumbs up
Mon Feb 10, 2014, 3:03 pm

pipe insulation

NC-2009 EAp2:Minimum Energy Performance
posted by  Francesco Passerini  on 

If I model a hydronic HVAC plant shall I consider in the proposed model the heat losses through the pipes? And in the baseline model?

2
b.i.g. Bechtold DesignBuilder Expert
LEEDuser Basic Member
581 thumbs up
Mon Feb 10, 2014, 2:38 pm

No contaminant area-related-sources

NC-2009 IEQp1:Minimum IAQ Performance
posted by  Ian McCall  on 

Dear LEED Users, I have a question regarding the prerequisite 1 of IEQ Section: Minimum Indoor Air Quality Pollution. According to the Ventilation Rate Procedure of ASHRAE Standard 62.1-2007, the

6
Chief Engineer
Lile Engineering, LLC
LEEDuser Basic Member
59 thumbs up
Mon Feb 10, 2014, 1:45 pm

Eap2. Fan Power Limitation Pressure Drop Adjustments.

NC-2009 EAp2:Minimum Energy Performance
posted by  Carlos Vazquez  on 

We are in process of submitting for certification a health care out patient clinic. The proposed buiding has air handling units are chilled water cooled with many devices.

2
LEED Fellow
7group / Energy Opportunities
LEEDuser Expert
4454 thumbs up
Mon Feb 10, 2014, 9:23 am

CIR and Documentation

LEED Reviews: Appeals, Design/Construction Submittals, and more
posted by  Erika Duran  on 

Does anyone know if you have submitted a CIR and gotten positive feedback on your strategy, do you have to upload the response with your credit documentation or is it linked already to your projec

2
Sun Feb 9, 2014, 5:33 pm

Help! Where can I find ArcEditor 9.3 for the Connections Tool?

General forums
posted by  Eric Orozco  on 

Greetings! According to the Connections Tool resource page on LEED-Online: "The user must have ArcEditor 9.3 or ArcInfo 9.3.

6
LEED AP-ND, Principal
Criterion Planners
LEEDuser Expert
231 thumbs up
Sat Feb 8, 2014, 5:35 pm

Credit requirement clarification.

Healthcare-v2009 SSc9.1:Connection to the natural world - places of respite
posted by  BABAR MEHMOOD  on 

We are working on a healthcare out patient clinic. The credit says that we will take the net usable area excluding the building equipement, vertical circulation and structure.

3
Sat Feb 8, 2014, 4:18 pm