LEED boundary- no parking lotNC-2009 SSc8: Light Pollution Reductionposted by Danna Lopez on Jun 28, 2011, 5:57 pm
The LEED boundary for our project does not include the parking lot near the building. The form indicates that we must "upload a photometric site plan of the parking areas with a footcandle... |
|
Definition of RoofCS-2009 SSc7.2: Heat island effect - roofposted by Florian Schmidtchen on Oct 20, 2010, 10:13 pm
I am working on a project consisting of a horinzontal... Last reply: Susann Geithner, Jun 28, 2011, 5:33 pm |
|
Ink CartridgesEBOM-2009 MRc7: Solid waste management - ongoing consumablesposted by Kimberlee Dobbins on Jun 27, 2011, 2:54 pm
I am having difficulty on what to do with all my ink. I work for a city government, and can not go to recycled ink due to contracts with the printing company.I read in the LEED... Last reply: Barry Giles, Jun 28, 2011, 3:00 pm |
|
HVAC Equipment EfficiencyNC-2009 EAp2: Minimum Energy Performanceposted by Ricardo Sobral on Jun 27, 2011, 1:40 pm
Dear LEED Users, Does anybody know if the minimum HVAC equipment efficiencies listed in Tables 6.8.1 of Standard 90.1 apply to the generator (i.e chiller, boiler, heat pump) or to the... Last reply: Aaron Wascher, Jun 28, 2011, 2:09 pm |
|
Language of DocumentsNC-2009 EAp1: Fundamental Commissioning of Building Energy Systemsposted by Catalina A on Jun 8, 2011, 5:49 pm
Does anyone know how the documents and technical specifications of the different projects (HVAC, Electricity, Lighting, hot water, etc.) have to be presented to the... Last reply: Tristan Roberts, Jun 28, 2011, 1:01 pm |
|
Exemplary PerformanceCS-2009 IEQc8.2: Daylight and views - viewsposted by BH . on Apr 29, 2011, 9:21 am
Hi, I would like to confirm if in point 3 of exemplary performance mean that within a distance of 3 x 42`` (typically) there will be no obstacles like glass walls, furnitures ect. between... Last reply: Jill Perry, PE, Jun 28, 2011, 11:42 am |
|
Split Site RecyclingNC-2009 MRc2: Construction Waste Managementposted by Jon Texter on Jun 13, 2011, 12:07 pm
We are working on a 10 building apartment complex, which consists of 9 Residential Buildings and a Community Building. The Community building is attempting LEED NC Silver, but the Residential... Last reply: RETIRED, Jun 28, 2011, 11:36 am |
|
Basis of Design (BOD)NC-2009 EAp1: Fundamental Commissioning of Building Energy Systemsposted by Peter Doo on Jun 28, 2011, 9:06 am
Lately, engineers have been submitting their specifications as the Basis of Design document. We haven't submitted any for review yet but this has occurred several times by different engineers. Is... Last reply: Scott Bowman, Jun 28, 2011, 10:02 am |
|
Complying with "Reasonable LEED Boundary" and excluding irrigatiSchools-2009 WEc1: Water Efficient Landscapingposted by Sylvia Schwartz on Jun 10, 2011, 2:03 pm
I am having difficulty interpreting the paragraph in this credit describing how to deal with athletic fields. It seems to me that it would be acceptable to draw the LEED boundary including... Last reply: Tristan Roberts, Jun 28, 2011, 7:31 am |
|
IEQ3.2 IAQ MANAGEMENT PLAN- OPTION 2NC-2009 IEQc3.2: Construction IAQ management plan - before occupancyposted by Jérôme Aruanno on Jun 8, 2011, 10:43 am
Hi, I am questioning about the second option, mesuring the contaminant levels. The table p 462 is indicating level to respect. but in front of each specific contaminant, there is... Last reply: Tristan Roberts, Jun 28, 2011, 6:17 am |