Topic | Recent |
---|---|
Cycle lane between project and Bicycle NetworkNC-v4 LTc6: Bicycle facilitiesposted by Alicia Costas Freire on Oct 26, 2015, 12:01 pm
Hello, I have a quick question and I would very much appreciate if someone could assist. |
|
Excluding demand for occupancy sensors in retail sales areaRetail-CI-v2009 EAc1.2: Optimize energy performance - lighting controlsposted by Eleftherios Zacharakis on Oct 28, 2015, 4:03 pm
I have a retail store that the sales area is always occupied and therefore not on occupancy sensor. The sales floor is on a time clock instead. The rest of the store is on occupancy sensor. Can... |
|
DES Option 1- Baseline System Heating Type Modeling GuidanceHealthcare-v2009 EAc1: Optimize Energy Performanceposted by Mike Ramos on Oct 29, 2015, 7:43 pm
Hi all, I'm hoping someone can clarify how to model the ASHRAE Baseline systems in compliance with the "Treatment of District or Campus Thermal Energy in LEED v2 and LEED 2009 - Design and... |
|
Calculating Ds for cooling conditionNC-2009 IEQp1: Minimum indoor air quality performanceposted by William Beechinor on Nov 3, 2015, 1:31 pm
Hello, I am trying to determine whether or not I am calculating Ds correctly. I previously had every zone set to 100% Ds, but I was told that Ds = the minimum supply air flowrate/maximum... |
|
VOC MetersDiscuss the LEED Dynamic Plaque and Arcposted by Johanna Hendricks on Nov 4, 2015, 8:02 am
Has anyone purchased a meter for the annual... |
|
EQ PC 57- French feedbackCS-2009 IDc1: Innovation in Designposted by Elodie DUMAS on Nov 4, 2015, 10:32 am
Dear all, A short feedback about our experience concerning EQ PC 57 use, for an office tower project in France (Marseille) under LEED CS V3. |
|
n/aCS-2009 IEQp1: Minimum indoor air quality performanceposted by Alan Viale on Nov 5, 2015, 12:11 pm
Dear all, |
|
Tools and flexibilityPilot-Credits MRpc63: Whole building life cycle assessmentposted by Devani PERERA on Nov 13, 2015, 7:23 am
There are secral tools that can be used for LCA but it appears that some tools are more detailed than others. In europe the calculation methods seems to go into great detail. I think its great... |
|
LEED V3 2009 SSc3- Asbestos contaminationGeneral forumsposted by Francis McNulty on Nov 13, 2015, 10:09 am
I have a project where two forms of asbestos contamination has been identified. One on pipework and the other in the existing floor slab adhesive - SSc3... |
|
when we register a pilot credit....Pilot-Credits EApc65: Monitoring based commissioningposted by Gail Napell on Nov 14, 2015, 3:03 pm
we registered the pilot credit; is it supposed to show up in the project in LEEDonline? how do we upload the documentation???? thanks for guidance - |