Monitoring based commissioning

LEED CREDIT

Pilot-Credits EApc65: Monitoring based commissioning 1 point

LEEDuser’s viewpoint

Frank advice from LEED experts

LEED is changing all the time, and every project is unique. Even seasoned professionals can miss a critical detail and lose a credit or even a prerequisite at the last minute. Our expert advice guides our LEEDuser Premium members and saves you valuable time.

Credit language

USGBC logo

© Copyright U.S. Green Building Council, Inc. All rights reserved.

Intent

Pilot Credit Closed
This pilot credit is closed, however, a similar credit is available for use through the Innovation catalog.
To further support the design, construction, and eventual operation of a project that meets the owner project requirements related to energy, water, indoor environmental quality and durability.

Requirements

Develop monitoring-based procedures and measurement points to be included in the Commissioning Plan. Address the following:

  • Roles and responsibilities
  • Measurement requirements: meters, points, metering systems, data access
  • List of points to be trended with associated frequency and duration for trending
  • Limits of acceptable values for tracked points and metered values. Where appropriate, the acceptable values can be determined by predictive algorithms in order to dynamically compare ideal values with actual values
  • Review elements that will be used to evaluate and identify performance of monitored points and associated systems, including but not limited to:
    • Conflict between systems
    • Out of sequence operation of systems components
    • Energy and water usage profiles
  • An action plan for correction of operational issues and deficiencies
    • Identification of operational errors and recommended training to help ensure errors are not duplicated
    • Repairs needed to maintain performance
  • Frequency of analyses in the first year of occupancy; analyses must occur at least quarterly

General Pilot Documentation Requirements

Register for the pilot credit Credits 1-14 Credits 15-27 Credits 28-42 Credits 43-56 Credits 57-67 Credits 68-82 Credits 83--96
Credit Specific:
  1. Confirm that the commissioning report contains the following:
    • List of systems that are metered, along with meter information and points that are monitored.
    • List of points trended with associated intervals and duration for trending
    • Limits of acceptable values for tracked points and metered values
    • List of issues identified regarding performance of monitoring points and associated systems, as well as corrective actions taken
  2. In the executive summary:
    • In addition to the items provided in the executive summary for EA Prerequisite 1: Fundamental Commissioning of Building Energy Systems, provide a summary of the items that are called out to be included in the commissioning report above.
Note: With the submission of this pilot credit, include the commissioning report summary that was provided for EA Prerequisite 1: Fundamental Commissioning of Building Energy Systems in upload EAp1-1.
See all forum discussions about this credit »

What does it cost?

Cost estimates for this credit

On each BD+C v4 credit, LEEDuser offers the wisdom of a team of architects, engineers, cost estimators, and LEED experts with hundreds of LEED projects between then. They analyzed the sustainable design strategies associated with each LEED credit, but also to assign actual costs to those strategies.

Our tab contains overall cost guidance, notes on what “soft costs” to expect, and a strategy-by-strategy breakdown of what to consider and what it might cost, in percentage premiums, actual costs, or both.

This information is also available in a full PDF download in The Cost of LEED v4 report.

Learn more about The Cost of LEED v4 »

Documentation toolkit

The motherlode of cheat sheets

LEEDuser’s Documentation Toolkit is loaded with calculators to help assess credit compliance, tracking spreadsheets for materials, sample templates to help guide your narratives and LEED Online submissions, and examples of actual submissions from certified LEED projects for you to check your work against. To get your plaque, start with the right toolkit.

Get the inside scoop

Our editors have written a detailed analysis of nearly every LEED credit, and LEEDuser premium members get full access. We’ll tell you whether the credit is easy to accomplish or better left alone, and we provide insider tips on how to document it successfully.

USGBC logo

© Copyright U.S. Green Building Council, Inc. All rights reserved.

Intent

Pilot Credit Closed
This pilot credit is closed, however, a similar credit is available for use through the Innovation catalog.
To further support the design, construction, and eventual operation of a project that meets the owner project requirements related to energy, water, indoor environmental quality and durability.

Requirements

Develop monitoring-based procedures and measurement points to be included in the Commissioning Plan. Address the following:

  • Roles and responsibilities
  • Measurement requirements: meters, points, metering systems, data access
  • List of points to be trended with associated frequency and duration for trending
  • Limits of acceptable values for tracked points and metered values. Where appropriate, the acceptable values can be determined by predictive algorithms in order to dynamically compare ideal values with actual values
  • Review elements that will be used to evaluate and identify performance of monitored points and associated systems, including but not limited to:
    • Conflict between systems
    • Out of sequence operation of systems components
    • Energy and water usage profiles
  • An action plan for correction of operational issues and deficiencies
    • Identification of operational errors and recommended training to help ensure errors are not duplicated
    • Repairs needed to maintain performance
  • Frequency of analyses in the first year of occupancy; analyses must occur at least quarterly

General Pilot Documentation Requirements

Register for the pilot credit Credits 1-14 Credits 15-27 Credits 28-42 Credits 43-56 Credits 57-67 Credits 68-82 Credits 83--96
Credit Specific:
  1. Confirm that the commissioning report contains the following:
    • List of systems that are metered, along with meter information and points that are monitored.
    • List of points trended with associated intervals and duration for trending
    • Limits of acceptable values for tracked points and metered values
    • List of issues identified regarding performance of monitoring points and associated systems, as well as corrective actions taken
  2. In the executive summary:
    • In addition to the items provided in the executive summary for EA Prerequisite 1: Fundamental Commissioning of Building Energy Systems, provide a summary of the items that are called out to be included in the commissioning report above.
Note: With the submission of this pilot credit, include the commissioning report summary that was provided for EA Prerequisite 1: Fundamental Commissioning of Building Energy Systems in upload EAp1-1.

In the end, LEED is all about documentation. LEEDuser’s Documentation Toolkit, for premium members only, saves you time and helps you avoid mistakes with:

  • Calculators to help assess credit compliance.
  • Tracking spreadsheets for materials purchases.
  • Spreadsheets and forms to give to subs and other team members.
  • Guidance documents on arcane LEED issues.
  • Sample templates to help guide your narratives and LEED Online submissions.
  • Examples of actual submissions from certified LEED projects.
See all LEEDuser forum discussions about this credit » Subscribe to new discussions about Pilot-Credits EApc65