Multiple Buildings Project Certification

CS-2009 PIf1: Minimum Program Requirements
posted by Mario S. on Jun 17, 2015, 7:38 am

We have a project with 3 buildings located on the same plot, that are physically attached by two underground levels made up of technical rooms, parking spaces, bicycle racks, showers and garbage...

DOE Case Study- website?

Credit Forums
posted by Peg Manuel on Jun 18, 2015, 7:54 pm

In the past, the following website was an excellent place to upload a case study:
US Department of Energy's Federal Energy Management Program "High Performance
Federal Buildings...

Structures connected through a walkway

NC-2009 PIf1: Minimum Program Requirements
posted by Ricardo Sá on Jun 22, 2015, 7:20 am

I'm working on a project that has two structures connected through a suspended walkway. The first consists mainly of warehouse areas (distribution centre) with some auxilliary office areas. The...

Submission of Design Cr. during Constr. Final Rev. f. 2nd round

LEED Reviews: Appeals, Design/Construction Submittals, and more
posted by Lise Dannesboe on Jun 28, 2015, 7:40 am

Hi!
Split-Review project: We submitted a Design credit for Design Prelim Review and for the Final Design Review, I would like to put this credit on hold and first submit for a second round...

Meter for Water Use in Laundry

Healthcare-v2009 WEc2: Water use reduction - measurement and verification
posted by Jon Penndorf on Jun 29, 2015, 11:03 am

Does the requirement to meter water used for laundry apply to all type of laundry equipment. For example would is apply to a residential type washing machine or only commercial grade? Thanks

Gypsum board recycling resource, Saudi Arabia

NC-2009 MRc2: Construction Waste Management
posted by Shreepad Bandagi on Jun 30, 2015, 7:20 am

Wondering if anyone would have a resource for gypsum board recycling anywhere in Saudi Arabia. Thanks!

LEED excluded areas within LEED project boundary

CI-2009 PIf1: Minimum Program Requirements
posted by Susan Di Giulio on Jun 30, 2015, 2:53 pm

A commercial tenant has a lease on a whole building. two areas of the building, a gym and a cafe for employees, are completely separated (ie party walls with no connecting interior door) and will...

Questions about High-rise residential LEED Energy Modeling

NC-2009 EAc1: Optimize Energy Performance
posted by Tommy Xing on Jul 1, 2015, 3:11 pm

Hi I’m working on a High-rise residential LEED energy modeling project now. I have a question regarding the lighting. I’m using Energypro, and found out the lighting saving is zero from the Title...

Base building system

CI-2009 IEQp1: Minimum indoor air quality performance
posted by Graham Langton on Jul 3, 2015, 11:16 am

Hi,

To what extent does the...

Pick up and Drop Facility

CI-2009 SSc3.1: Alternative transportation - public transportation access
posted by Priyadarsi Das on Jul 6, 2015, 8:52 am

We have a CI project which is basically a part of a factory development. The Admin Building is going for the LEED CI rating. We have provided Pick up and drop facility for the occupants of our...