Topic | Recent |
---|---|
Multiple Buildings Project CertificationCS-2009 PIf1: Minimum Program Requirementsposted by Mario S. on Jun 17, 2015, 7:38 am
We have a project with 3 buildings located on the same plot, that are physically attached by two underground levels made up of technical rooms, parking spaces, bicycle racks, showers and garbage... |
|
DOE Case Study- website?Credit Forumsposted by Peg Manuel on Jun 18, 2015, 7:54 pm
In the past, the following website was an excellent place to upload a case study: |
|
Structures connected through a walkwayNC-2009 PIf1: Minimum Program Requirementsposted by Ricardo Sá on Jun 22, 2015, 7:20 am
I'm working on a project that has two structures connected through a suspended walkway. The first consists mainly of warehouse areas (distribution centre) with some auxilliary office areas. The... |
|
Submission of Design Cr. during Constr. Final Rev. f. 2nd roundLEED Reviews: Appeals, Design/Construction Submittals, and moreposted by Lise Dannesboe on Jun 28, 2015, 7:40 am
Hi! |
|
Meter for Water Use in LaundryHealthcare-v2009 WEc2: Water use reduction - measurement and verificationposted by Jon Penndorf on Jun 29, 2015, 11:03 am
Does the requirement to meter water used for laundry apply to all type of laundry equipment. For example would is apply to a residential type washing machine or only commercial grade? Thanks |
|
Gypsum board recycling resource, Saudi ArabiaNC-2009 MRc2: Construction Waste Managementposted by Shreepad Bandagi on Jun 30, 2015, 7:20 am
Wondering if anyone would have a resource for gypsum board recycling anywhere in Saudi Arabia. Thanks! |
|
LEED excluded areas within LEED project boundaryCI-2009 PIf1: Minimum Program Requirementsposted by Susan Di Giulio on Jun 30, 2015, 2:53 pm
A commercial tenant has a lease on a whole building. two areas of the building, a gym and a cafe for employees, are completely separated (ie party walls with no connecting interior door) and will... |
|
Questions about High-rise residential LEED Energy ModelingNC-2009 EAc1: Optimize Energy Performanceposted by Tommy Xing on Jul 1, 2015, 3:11 pm
Hi I’m working on a High-rise residential LEED energy modeling project now. I have a question regarding the lighting. I’m using Energypro, and found out the lighting saving is zero from the Title... |
|
Base building systemCI-2009 IEQp1: Minimum indoor air quality performanceposted by Graham Langton on Jul 3, 2015, 11:16 am
Hi, To what extent does the... |
|
Pick up and Drop FacilityCI-2009 SSc3.1: Alternative transportation - public transportation accessposted by Priyadarsi Das on Jul 6, 2015, 8:52 am
We have a CI project which is basically a part of a factory development. The Admin Building is going for the LEED CI rating. We have provided Pick up and drop facility for the occupants of our... |