Water use reduction - measurement and verification

Healthcare-v2009 WEc2: Water use reduction - measurement and verification

LEEDuser overview

Frank advice from LEED experts

LEED is changing all the time, and every project is unique. Even seasoned professionals can miss a critical detail and lose a credit or even a prerequisite at the last minute. Our expert advice guides our LEEDuser Premium members and saves you valuable time.

For full access, sign up now for LEEDuser Premium

Already a premium member? Log in now

Credit language

USGBC logo

© Copyright U.S. Green Building Council, Inc. All rights reserved.

Requirements

Install meters to track the following water uses (as applicable to the project):

  • Cooling tower make-up and blowdown
  • Incoming water to the project
  • Purified water system (reverse osmosis and/or de-ionized)
  • Filter backwash water
  • Water use in dietary department
  • Water use in laundry
  • Outdoor Irrigation systems
  • Steam boiler systems make-up water

AND

Install meters to track the water use in any two (for one point) or any three (for two points) of the following:
  • Water use in laboratory
  • Water use in central sterile and processing department
  • Water use in physio- and hydrotherapy treatment areas
  • Water use in surgical suite
  • Closed-loop hydronic systems make-up water
  • Cold-water make-up for domestic hot water systems

AND

The Measurement and Verification (M&V) period shall cover a period of no less than one year of post-construction occupancy. Use the International Performance Measurement and Verification Protocol (IPMVP) Volume 1, Concepts for Determining Energy and Water Savings, March 2002, to provide for long term continuous measurement of potable cold water uses within the facility. [Option D: Calibrated Simulation (Savings Estimation Method 2 - See Volume III, April 2003, for description of Option D, Savings Estimation Method) – for new construction; or Option B: Retrofit Measure Isolation – for renovation]. See all forum discussions about this credit »

Frequently asked questions

No results found
See all forum discussions about this credit »

What does it cost?

Cost estimates for this credit

On each BD+C v4 credit, LEEDuser offers the wisdom of a team of architects, engineers, cost estimators, and LEED experts with hundreds of LEED projects between then. They analyzed the sustainable design strategies associated with each LEED credit, but also to assign actual costs to those strategies.

Our tab contains overall cost guidance, notes on what “soft costs” to expect, and a strategy-by-strategy breakdown of what to consider and what it might cost, in percentage premiums, actual costs, or both.

This information is also available in a full PDF download in The Cost of LEED v4 report.

Learn more about The Cost of LEED v4 »

For full access, sign up now for LEEDuser Premium

Already a premium member? Log in now

Checklists

Step by step to LEED certification

LEEDuser’s checklists walk you through the key action steps you need to earn a credit, including how to avoid common pitfalls and save money.

For full access, sign up now for LEEDuser Premium

Already a premium member? Log in now

Documentation toolkit

The motherlode of cheat sheets

LEEDuser’s Documentation Toolkit is loaded with calculators to help assess credit compliance, tracking spreadsheets for materials, sample templates to help guide your narratives and LEED Online submissions, and examples of actual submissions from certified LEED projects for you to check your work against. To get your plaque, start with the right toolkit.

For full access, sign up now for LEEDuser Premium

Already a premium member? Log in now


Addenda

This credit has no LEEDuser summary

See all forum discussions about this credit »

LEEDuser overview

Frank advice from LEED experts

LEED is changing all the time, and every project is unique. Even seasoned professionals can miss a critical detail and lose a credit or even a prerequisite at the last minute. Our expert advice guides our LEEDuser Premium members and saves you valuable time.

For full access, sign up now for LEEDuser Premium

Already a premium member? Log in now

Credit language

USGBC logo

© Copyright U.S. Green Building Council, Inc. All rights reserved.

Requirements

Install meters to track the following water uses (as applicable to the project):

  • Cooling tower make-up and blowdown
  • Incoming water to the project
  • Purified water system (reverse osmosis and/or de-ionized)
  • Filter backwash water
  • Water use in dietary department
  • Water use in laundry
  • Outdoor Irrigation systems
  • Steam boiler systems make-up water

AND

Install meters to track the water use in any two (for one point) or any three (for two points) of the following:
  • Water use in laboratory
  • Water use in central sterile and processing department
  • Water use in physio- and hydrotherapy treatment areas
  • Water use in surgical suite
  • Closed-loop hydronic systems make-up water
  • Cold-water make-up for domestic hot water systems

AND

The Measurement and Verification (M&V) period shall cover a period of no less than one year of post-construction occupancy. Use the International Performance Measurement and Verification Protocol (IPMVP) Volume 1, Concepts for Determining Energy and Water Savings, March 2002, to provide for long term continuous measurement of potable cold water uses within the facility. [Option D: Calibrated Simulation (Savings Estimation Method 2 - See Volume III, April 2003, for description of Option D, Savings Estimation Method) – for new construction; or Option B: Retrofit Measure Isolation – for renovation]. See all forum discussions about this credit »