Topic | Recent |
---|---|
Gross Lighted Area- ASHRAE 90.1-2007CI-2009 EAc1.1: Optimize energy performance - lighting powerposted by Trevor Karstens on Jul 7, 2011, 4:57 pm
This topic was previously posted under EAp2, but was not getting any responses; this seems like the more relevant location anyways: I'm encountering difficulty in documenting the minimum... Last reply: Susann Geithner, Aug 17, 2011, 10:57 am |
|
Existing Fixtures Calculated in Installed Lighting Power?CI-2009 EAc1.1: Optimize energy performance - lighting powerposted by David Rodriguez on Aug 16, 2011, 6:45 pm
I have a renovation project where there are three rooms in which we are not replacing the light fixtures. ASHRAE 90.1 Section 9.1.1 states, "..lighting requirements for existing building are... Last reply: Susann Geithner, Aug 17, 2011, 10:49 am |
|
Option 2, Outside USPilot-Credits PC12: Reduced Automobile Dependenceposted by Anna Korinkova on Aug 16, 2011, 8:22 am
Hi all, Last reply: Fred Dock, Aug 16, 2011, 4:31 pm |
|
Hard copy signaturesGeneral forumsposted by Mike Barker on Aug 16, 2011, 4:26 am
My observations, from an international point of view, are as follows :- 1) A hard copy, in the form of a comitment by the engineer on a company letterhead with his full signature, will... |
|
AGMBC Part IILEED Guidance for Campuses and Multiple Buildingsposted by Cara Mae Cirignano on Oct 26, 2010, 12:30 pm
Unfortunately, if your project is registered under a 2009 rating system, or not yet registered, we do not allow use of the 2005 document. We plan to publish AGMCB Part II in early 2011 - we... Last reply: Lindsey Perez, Aug 15, 2011, 4:13 pm |
|
Counting surfacesPilot-Credits PC19: Whole Building Reuseposted by Bradley Guy on Aug 15, 2011, 12:33 pm
Hello Heather, Last reply: Heather Walters, Aug 15, 2011, 1:16 pm |
|
Varying sill heightsNC-2009 IEQc8.2: Daylight and views - viewsposted by Sara Sweeney on Aug 12, 2011, 4:48 pm
I am working on a project - a preschool, and the architect has windows with varying sill heights. Some windows have a sill height of 48 inches AFF and other windows have a sill height of 6 inches... Last reply: Heather Appell, Aug 15, 2011, 11:53 am |
|
Method ChoosingEBOM-2009 EAc1: Optimize Energy Efficiency Performanceposted by Austin Evans on Jul 6, 2011, 10:06 am
This is an industrial manufacturing facility, and we have filed our data online with Energy Star as Other-Other. We have the 3 years of historical data, but really feel like it's unfair to be... Last reply: Aaron Nelson, Aug 15, 2011, 11:12 am |
|
Major problem with the credit, in my opinionPilot-Credits PC19: Whole Building Reuseposted by Heather Walters on Aug 15, 2011, 7:37 am
As I see it the major issue with this credit is the 75% threshold in MR 1.1 &1.3. Consider two possible assemblies. |
|
ID Credit for 100% Outside air?NC-2009 IDc1: Innovation in Designposted by Nelina Loiselle on Aug 12, 2011, 3:46 pm
Has anyone tried pursuing an ID credit for using 100% outside air in the building's HVAC systems? Last reply: Robert Phinney, Aug 12, 2011, 5:12 pm |