Forum quick links
Washing Existing Concrete and Default Values
NC-2009 SSc7.1:Heat Island Effect—Non-Roofposted by Sonrisa Lucero on
Has anyone tried to clean and lighten existing concrete to qualify for this credit?
Not enclosed meeting room
NC-2009 IEQc1:Outdoor Air Delivery Monitoringposted by CT G on
Dear all, We are working with a project that have a densely occupied meeting room.
SIGNALIZATION SIZE
CS-2009 SSc4.3:Alternative Transportation—Low-Emitting and Fuel-Efficient Vehiclesposted by OSCAR DE LA RED on
Is there any requirement for the signalization size and position (on the wall, on the floor, etc..) for credit 4.3 preferred parking places?
Case 1 - Grouping the space types
EBOM-2009 IEQp1:Minimum IAQ Performanceposted by satheesh M on
Hi, we are working for the project with multiple tenants. we could not collect all the floors HVAC layouts. but we have the AHU details.
Existing Building Baseline WWR
NC-2009 EAc1:Optimize Energy Performanceposted by Christian Kaltreider on
Referencing 90.1 Table G3.1.5: I understand that the envelope for an existing building baseline model should reflect existing conditions concerning thermal properties of walls and windows.
Applicable credits for chemical free cooling tower maintenance
EBOM-2009 WEc4:Cooling Tower Water Managementposted by Julie Klein on
I am looking at a chemical free cooling tower maintenance system that returns huge water savings. Is there a threshold on the number of credits for one facility component?
Dormitory Project- Single Bedrooms like Private Offices
NC-2009 IEQc8.2:Daylight and Views—Viewsposted by Emma Leonard on
I am working on a dormitory project with mainly single bedrooms. Can I count these rooms like private offices and not have to calculate the actual area in each space?
Linen Area
Healthcare-v2009 IEQp1:Minimum indoor air quality performanceposted by Gabriela Crespo on
Hi! I have a question regarding the ventilation requirement for the Linen Area, according to the Space Matrix file, there needs to be Outdoor air for this space.
Outside Mat
NC-2009 IEQc4.3:Low-Emitting Materials—Flooring Systemsposted by Waterset CDD on
Hello, We have an outside mat that needs to be replaced. It was actually glued down during instillation. I would like to know the following: 1.
Museum Exhibit Lighting
NC-2009 EAc1:Optimize Energy Performanceposted by Christian Kaltreider on
I am modeling a museum with separately controlled exhibit lighting. I am using Section 9.6 of 90.1 2007 (space by space) to calculate my baseline general lighting power densities.