Forum quick links
Regional Priority Point
Pilot-Credits SSpc83:Offsite Financial Support for Habitat Protectionposted by Kai Starn on
Our project is located in Philadelphia, PA and the project is therefore eligible for a Regional Priority point for SSc5.1 - Protect or Restore Habitat.
Compliance?
Pilot-Credits EQpc78:Design for active occupantsposted by Bernard Dooley on
Could you clarify why a comment on this forum is required even though we have no unresolved questions?
I Have Lost All Patience with LEEDOnline
posted by Caroline O'Leary on
It is absolutely insane the amount of time I (and I'm sure many others) waste working with LEEDOnline. The "quirks and bugs" are entirely too numerous to list.
Alternate Transportation: SSc4.3 and SSc4.4
NC-2009 SSc4.3:Alternative Transportation—Low-Emitting and Fuel-Efficient Vehiclesposted by Greg Snow on
Hi Everyone, I am filling out the LEED letter template for SSc4.3 and SSc4.4 and don't know which path/option I should check.
EAc6 baseline and PP?
EBOM-2009 EAc6:Emissions Reduction Reportingposted by Kasandra Martin on
It says there is to be a baseline year to compare with the performance period. My project is an addition to an existing building that has never been certified.
EAc3 - Enhanced Commissioning, LEED v2009
NC-2009 EAc3:Enhanced Commissioningposted by Jared Reed on
Our project is pursuing EAc3 - Enhanced Commissioning. The reference manual states that the CxA performing the enhanced commissioning must also perform the fundamental commissioning.
Timeline to File an Appeal
posted by Jason Moody on
Our project was denied credit due to a failed pre-requisite during the final review. The client once us to file an appeal to address the pre-requisite.
Energy Process
NC-2009 EAp2:Minimum Energy Performanceposted by Nativa Architecture on
Shall we use LEED 2009 BD+C if the new building has 35% of energy process ? The main function is mechanical kneading without cooking process and warehouse.
Cooling plant modeling
NC-2009 EAp2:Minimum Energy Performanceposted by Vassil Vassilev on
In the project we are modeling the cooling plant which serves the production area and the buildings' HVAC systems is one and the same.