Hi Everyone,

I am filling out the LEED letter template for SSc4.3 and SSc4.4 and don't know which path/option I should check. The project is in Canada in a Campus; there are no parking allocated within the LEED boundary and no new parking added to the existing parking. I am using Campus path tpo meet the requirements of above credits i.e 3% of FTE for SSc4.3 and 5% of FTE for SSc4.4. In the LEED letter template, I am using the special circumstances path and will provide a narrative to explain the compliance.

Please advise if this procedure is correct?

I appreciate your feedback.