Log in
Forum
Topic

GE Profile 21.7 &15.5 Cu. Ft. Top-Freezer Refrigerators

NC-2009 EAc4: Enhanced Refrigerant Management
posted by Waylon Lo on Jul 19, 2012, 10:35 am

We've tried and cannot get any info from GE other than they use R-134A refrigerant. Can anyone tell me from the valumes of these refrigerators normally for residential use that they might use...

Last reply: Nadav Malin, Jul 19, 2012, 11:16 am

Exterior Lighting?

CS-2009 SSc8: Light Pollution Reduction
posted by Hrvoje Kvasnicka on Jul 19, 2012, 8:25 am

I'm working on an office project that has a retail element on the ground floor. The retail area features a corridor connecting individual retail units which is open at its ends, ie. no doors will...

Baseline HVAC System for laboratory

CS-2009 EAp2: Minimum Energy Performance
posted by Yu Wang on Jun 20, 2012, 5:37 am

I am not clear about explanation from ASHRAE 90.1-2007 User’s Manual:
1. For laboratory spaces with a min. exhaust of 5000 cfm, the HVAC system type should be 5 or 7 and reducethe exhaust...

Last reply: Yu Wang, Jul 19, 2012, 3:52 am

Custodial Sinks and Faucets

EBOM-2009 WEc2: Additional Indoor Plumbing Fixture and Fitting Efficiency
posted by Patrick Culhane on Jan 12, 2012, 5:20 pm

I'd like to clarify whether this credit only applies to those domestic fixtures used by tenants or if faucets used by custodial staff also need to be included?

Last reply: Alexa Stone, Jul 18, 2012, 3:48 pm

Water meters to show compliance?

EBOM-2009 WEc2: Additional Indoor Plumbing Fixture and Fitting Efficiency
posted by Iris Amdur on Jun 19, 2012, 9:41 am

In the earlier versions of this ratings system, you could show metered water usage, to prove reduction over the baseline. Is this no longer true? It seems like they only want the design case (aka...

Last reply: Alexa Stone, Jul 18, 2012, 3:45 pm

LEED SS Credit 6.2- NYC building, Tight Fit

NC-2009 SSc6.2: Stormwater design - quality control
posted by Matthieu Bouadana on Jul 18, 2012, 10:47 am

Hoping someone could help me out - I'm looking for a Stormwater Management system which will be going under a NYC building to fulfill LEED SS Credit 6.2. All the strormwater management systems I...

Last reply: Michael DeVuono, Jul 18, 2012, 12:39 pm

single stream recycling

CI-2009 MRp1: Storage and Collection of Recyclables
posted by Adam Targowski on Jul 18, 2012, 5:52 am

Will the requirements of this prerequisite be complied with only by having a waste storage room for the whole building with one container for a single stream recycling (that will accommodate all...

Last reply: Lisa Fabula, Jul 18, 2012, 12:30 pm

Natural ventilation inmultilevel carpark areas

NC-2009 IEQp1: Minimum indoor air quality performance
posted by Puteri Shireen Jahnkassim on May 16, 2011, 10:04 pm

Dear Tristan

I am working on a retail mall which an adjoining carpark block. the carpark block is part of the retail mall and hence within the project boundary

Does using natural...

Last reply: Albert Sagrera, Jul 18, 2012, 11:50 am

EU Standards vs LEED

NC-2009 IEQc4.1: Low-emitting materials - adhesives and sealants
posted by Tanja Arnesson on Dec 12, 2011, 8:53 am

We have some problem with the...

Last reply: Yetsuh Frank, Jul 18, 2012, 11:35 am

Drawings showing location of Daylight Sensors

NC-2009 EAp2: Minimum Energy Performance
posted by Maya Karkour on Jul 16, 2012, 10:44 am

Dear all,

We are modelling an office tower under LEED C&S 2009. The owner is NOT fitting out the offices of each floor (They are within the tenants' premises).

One of the energy...

Last reply: Jean Marais, Jul 18, 2012, 11:05 am