v4 - SSc6 Project vs Lighting boundary

General forums
posted by  Bill Swanson  on 

There appears to still be confusion on the differences between the Project Boundary and the Lighting Boundary. The Project boundary is the same as shown in every other credit.

1
Wed May 17, 2017, 4:45 pm

Flooring Minimum

CS-v4 EQc2:Low emitting materials
posted by  Michelle Rosenberger  on 

We have a CS warehouse that is struggling to achieve certification that will build out only restrooms and has no identified tenant to execute a lease agreement with.

1
Sat Aug 26, 2017, 5:07 pm

Eligible for Exemplary Performance Credit?

NC-2009 SSc6.1:Stormwater Design—Quantity Control
posted by  Owen Hyne  on 

We anticipate meeting/exceeding requirements for SSc6.1 "Quantity Control", but not SSc6.2 "Quality Control".

1
Sat Aug 26, 2017, 4:27 pm

Appying the requirements in a High Rise

Pilot-Credits EQpc78:Design for active occupants
posted by  Donald Green  on 

I saw a couple comments about applying the requirements of this Pilot Credit in a building other than 2 to 3 stories.

0

Open parking under the building

CS-2009 IEQc5:Indoor Chemical and Pollutant Source Control
posted by  Rasita Masalskyte  on 

Dear all, We have a case where an open parking garage is located on the ground floor (under the building). Apparently, no exchaust system can be applied in this case.

1
Wed Aug 30, 2017, 5:02 pm

Campus Projects, overlapping boundaries

Healthcare-v2009 MPR3:Must use a reasonable site boundary
posted by  Michele Helou  on 

MPR Supplemental Guidance page 16 states that projects in phases may have an overlapping boundary. Let's say phase 1 included shared drive and parking and it does NOT earn SSc7.1 or SSc8.

1
Sat Aug 26, 2017, 9:34 pm

How to specify for v4 LEED compliance

Data-Centers-NC-v4 MRc2:Building product disclosure and optimization - environmental product declarations
posted by  Lissa Spitz  on 

Any recommendations on specs for the v4 MR credits? For example, we used to say 10% recycled materials required.

1
Sat Aug 26, 2017, 11:19 am

Single certification for physically distinct structures

NC-v4 MPR2:Must use reasonable LEED boundaries
posted by  NAMRATA GUPTA  on 

We are pursuing LEED for a hotel cum resort project with 80 individual villas plus main admin block, spa block, utlity blocks etc.

1
Fri Jul 7, 2017, 8:17 pm

Smoking areas in places of congregation or pedestrian traffic

CS-2009 IEQp2:Environmental Tobacco Smoke (ETS) Control
posted by  Katherine Mariano  on 

Hello, We are currently doing a Campus project registered under CS.

1
Sat Aug 26, 2017, 10:55 pm

unfinished space simulation

NC-2009 EAp2:Minimum Energy Performance
posted by  Hongyun Zhou  on 

My building has four floors, and 4th flr is left empty for future use.

1