Forum quick links
Partially certifying building
EBOM-2009 SSc7.2:Heat Island Reduction—Roofposted by h r on
Upper floors of building are utilized as hotel and lower floors are utilized as office. Owners are diffrent. Only the office is going to certified under LEED EB except hotel.
Open Plan Office and Meeting Rooms
NC-2009 PIf3:Occupant and Usage Dataposted by Patrice McVeigh on
Hi All, I am working on a Core and Shell Project, where the majority of the building is an open plan office space with meeting rooms. How do I account for the meeting rooms when calculating the FT
n/a
NC-2009 IEQc4.1:Low-Emitting Materials—Adhesives and Sealantsposted by MARIA ESTHER LAMADRID on
How should i classify an elastomeric butyl rubber sealant- sealant tape used in the metal roof
Are wine coolers/chillers/refrigerators eligible for Energy Star
EBOM-2009 MRc2:Sustainable Purchasing—Durable Goodsposted by Haley Duncan on
I found several that say they are Energy Star certified, but they do not show up on Energy Star's database. Does anyone know if compact wine coolers are eligible for a rating?
Policy for Outdoor Seating
EBOM-v4 EQp2:Environmental Tobacco Smoke Controlposted by Gabriela Crespo on
Dear all, we have a multi-tenant project that includes restaurants, currently they have a smoking policy for outdoor seating, 1.is it possible to maintain the policy for outdoor smoking, if we comp
Future Fit-Out Space & Transients - Table Plf3-3 or Table Pfl3-4
Healthcare-v2009 PIf3:Occupant and Usage Dataposted by Catherine Blakemore on
My project is an addition with on future being future fit-out space.
Limiting site disturbance
NC-2009 SSc5.1:Site Development—Protect or Restore Habitatposted by Michael Smithing on
We have a site which meets the definition of greenfield. It was previously in agricultural use, and is now located in an industrial park.
Baseline Model Inputs
CS-2009 EAc1:Optimize Energy Performanceposted by Ciaran McCabe on
For the baseline model can I please confirm the following; Design Cooling SAT: According to ASHRAE 90.1 G3.1.2.8 should the supply temperture be 11 deg C less than room temp.
feedback
Pilot-Credits EApc65:Monitoring based commissioningposted by emily reese moody on
There was some confusion at the on start of the process as to who owned the analyzing and reporting of the data.
Ceramic Wall base
NC-2009 IEQc4.3:Low-Emitting Materials—Flooring Systemsposted by Neetika Parmar on
Does ceramic wall base have to be certified under Floorscore or does it automatically qualify similar to mineral based flooring tile ??