NC-2009 WEc1:Water Efficient Landscaping
posted by  Yueling Chen  on 

I just purchase a premium membership, but i can't download the word & excel version sample in Documentation toolkit, like Sample Narrative for WEC1-Option 1, Option2 Path1 & Path 2 in WE C1

1
Mon Nov 30, 2015, 11:52 pm

Additional Floors for Existing LEED Certified Project

CS-2009 PIf1:Minimum Program Requirements
posted by  Nandana Kumar  on 

Hi We have a project which is G+10 floors & is LEED CS 2008 Gold certified. Now the developer is planning to expand this building by adding 4 more floors over and above the 10th floor.

0

shuttle buses

NC-2009 SSc4.1:Alternative Transportation—Public Transportation Access
posted by  Weidong Luo  on 

there are 8 stops/stations within 1 mile radius form our project serving 47 public bus/light rail lines, and 2 of them are municipal public transportation hubs that connect the vicinity to downtown

1
Mon Feb 9, 2015, 3:05 am

Coat area - regularly occupied?

NC-2009 IEQc8.2:Daylight and Views—Views
posted by  Eric White  on 

We have an K-6 school project which is mostly views-compliant. One issue we are having in getting above 90% views requirement is the coat area at the rear of the classroom.

1
Tue Jan 20, 2015, 1:16 pm

Autocontrol vs smart sensor-activated faucets and duration times

NC-v4 WEp2:Indoor water use reduction
posted by  Heather DeGrella  on 

Per the LEEDv4 Reference Guide "Duration-based savings from auto-control faucets w/ automatic fixture sensors or metering controls are no longer allowed in the design case.

1
Thu Jan 29, 2015, 10:27 pm

Updates to LEEDOnline forms November-December 2014

General forums
posted by  Deborah Lucking  on 

It is wonderful that the new leedonline includes a feature that provides an update on new activities by various team members.

0

LEED Core&Shell?

LEED Rating System Selection
posted by  Lise Dannesboe  on 

Hi! Our building is a renovation project in which the developer does a total refurbishment of building base systems and building shell. The building is mainly office building, a small part appr.

1
Fri Nov 27, 2015, 6:27 pm

EAc2.3 - Ongoing Cx forms

EBOM-2009 EAc2.3:Existing Building Commissioning—Ongoing Commissioning
posted by  Alexis Voeltner  on 

Hi Hannah, do you have an example of what the on-going commissioning test form should look like?

1
Tue Jan 20, 2015, 6:52 pm

Ceramic wall tile adhesives and grouts

NC-2009 IEQc4.1:Low-Emitting Materials—Adhesives and Sealants
posted by  Nelina Loiselle  on 

Hello, This may seem like a stupid question, but I am working on a project that has porcelain wall tile being installed in bathrooms and I'm not sure how this is supposed to be listed under IEQc4.

1
Wed Jan 21, 2015, 12:58 am

What does LEED consider as Sitework?

NC-2009 SSp1:Construction Activity Pollution Prevention
posted by  Erika Duran  on 

Project sitework and stabalization techniques were implemented during the beginning stages of the project and followed our ESC plan as well as local jurisdiction requirements.

1