Polishing Powder
NC-2009 IEQc4.2:Low-Emitting Materials—Paints and Coatingsposted by Omar Elrawy on
Dear all, I have a polishing powder that is intended to be used for polishing marble surface.
Deadline for Appeal
posted by Marcio Alberto Casado Pereira on
Hi Folks, We received the final decisiona on a very complicated industrial building we are pursuing certification for and EAp2 and IEQp1 were denied.
We are in the process of
EBOM-v4 WEp1:Indoor water use reductionposted by LEED Pro Consultant on
We are in the process of certifying a Core and Shell building which does not have a previous LEED certification.
Cold C&S - No HVAC
CS-2009 EAc1:Optimize Energy Performanceposted by Scott Johnson on
We have a project that consists of a cold core and shell that will have warm lobby.
Pool in a Hotel
NC-2009 IEQc6.1:Controllability of Systems—Lightingposted by Mike Stopka on
Does this space need to comply with the Controllability credits? It seems dangerous to allow anyone in a hotel pool environment to control the lighting.
NC V4: Thermal Comfort
NC-v4 EQc5:Thermal comfortposted by Erik Gutierrez on
Hello, I am working on trying to obtain the indoor environmental quality-thermal comfort credit for a new construction. To be specific, the new construction is a restaurant.
Metered energy data
EBOM-v4 EAc4:Optimize energy performanceposted by LEED Pro Consultant on
We are in the process of certifying a LEED EBOM project. We have an inquiry for the required 12 months of continuous energy data.
PIf2
NC-2009 PIf2:Project Summary Detailsposted by shaun Andriano on
This might be an easy one... Our PI form 2 was recently not approved following final design review.
LEED O&M on a portion of a building
EBOM-v4 MPR3:Must comply with project size requirementsposted by LEED Pro Consultant on
Would a CI project (not LEED) that complies with the MPR's but consists of only a portion of a building (5 levels) be elegible for a LEED O&M certification?
No longer required to complete Design prereqs before review?
NC-2009 EAp2:Minimum Energy Performanceposted by Susan Di Giulio on
From what I have read about the new website, it is no longer required to complete all design prerequisites before submitting for Design Review (split review assumed).