EBOM-v4 EAc4:Optimize energy performance

Metered energy data

We are in the process of certifying a LEED EBOM project. We have an inquiry for the required 12 months of continuous energy data. The electricity meter installed takes data from two buildings (one which will not be certified). During six months through a FLUKE Power Logger we were able to determine the energy consumption for the building undergoing the certification by recording data during one full week for each month. Is it possible to consider these 6 months as part of the 12 month performance period, for both the prerequisite and credit considering that a permanent energy meter has been installed for each building now?

0

You rely on LEEDuser. Can we rely on you?

LEEDuser is supported by our premium members, not by advertisers.

Go premium for $15.95  »

Wed, 03/08/2017 - 21:04

The approach that you describe doesn't seem like it would work because only one weeks worth of electricity consumption was metered during each of the 6 months prior to installing the permanent meter. Generally, the performance period year cannot include any estimated energy consumption.

Add new comment

To post a comment, you need to register for a LEEDuser Basic membership (free) or login to your existing profile.