Log in
Forum » Poland
Topic

water bills received every 3 months

EBOM-2009 EAp2: Minimum Energy Efficiency Performance
posted by Agnieszka Rylska on May 17, 2016, 8:09 am

Our project receives water bills including water usage every 3 months. Is it acceptable to eneter meter readings and costs in EnergyStar Portfolio Manager tool for a period of 3 months instead of...

Last reply: Trista Brown, May 18, 2016, 1:12 pm

parking for fleet vehicle

NC-2009 SSc4.3: Alternative transportation - low-emitting and fuel-efficient vehicles
posted by Agnieszka Rylska on Feb 11, 2016, 6:48 am

In my project there are two areas dedicated for parking. One parking lot is designated for fleet vehicles so only workers who drive fleet cars can use it (this parking lot is situated in front of...

Last reply: Marilyn Specht, Feb 11, 2016, 12:53 pm

ASHRAE requirements for cooling towers

CS-2009 EAp2: Minimum Energy Performance
posted by Agnieszka Rylska on Dec 8, 2015, 5:14 am

As part of this Prerequisite we have to provide cooling towers that comply with requirements of section 6.4 of 90.1-2007 ASHRAE Standard. In Table 6.8.1G there are performance requirements listed...

Last reply: Marcus Sheffer, Dec 11, 2015, 10:48 am

Sensors calibration during the performace period

EBOM-2009 EAc3.1: Performance measurement - building automation system
posted by Agnieszka Rylska on Mar 18, 2015, 10:56 am

Is it necessary to calibrate sensors during the performance period even if the manufacturer’s recommended interval didn't pass yet? Or can it only be mentioned in the maintenence plan that the...

Last reply: Melissa Kelly, Dec 10, 2015, 10:18 am

No local zoning requirements

NC-2009 SSc4.4: Alternative transportation - parking capacity
posted by Agnieszka Rylska on Nov 30, 2015, 9:18 am

Is there an Alternative Complance Path for projects outside the US with no minimum local zoning requirements?

Last reply: Trista Brown, Dec 8, 2015, 1:24 pm

Previous coal mine area

NC-2009 SSc5.1: Site development - protect or restore habitat
posted by Agnieszka Rylska on Nov 27, 2015, 9:45 am

Is a site which is located on a teritory of a previous coal mine considered perviously developed? Coal mine works were limited only to underground works, the aboveground site was not affected at...

Last reply: Tristan Roberts, Nov 27, 2015, 11:53 am

Parking spaces for trucks

NC-2009 SSc4.4: Alternative transportation - parking capacity
posted by Alicja Bieszyńska on Nov 3, 2014, 9:07 am

My project is a distribution center that serves number of loading trucks every day. Obviously, the site plan includes parking spaces for them.
However, the local zoning requirements define...

Last reply: Tristan Roberts, Nov 26, 2015, 11:59 pm

pressure drop adjustemnt in the baseline model

CS-2009 EAp2: Minimum Energy Performance
posted by Agnieszka Rylska on Aug 11, 2015, 7:04 am

I have two questiones:
1. Pressure drop adjustment for heat recovery in the baseline fan power calculations can be taken only if the heat recovery is modeled in the baseline case regardless...

Last reply: Marcus Sheffer, Aug 31, 2015, 9:57 am

G3.1.2.8 Design airflow rates

CS-2009 EAp2: Minimum Energy Performance
posted by Agnieszka Rylska on May 6, 2015, 5:18 am

I have a question regarding section G3.1.2.8 of Appendix G. This section says that "design supply airflow rates for the baseline building design shall be based on a supply-air-to-room-air...

Last reply: Marcus Sheffer, Jun 11, 2015, 9:37 am

anticipated annual total ongoing consumables purchases

EBOM-2009 MRc1: Sustainable purchasing - ongoing consumables
posted by Agnieszka Rylska on Apr 1, 2015, 9:15 am

In the Reference Guide on page 254 in Table 1. it's written that "Purchases of of ongoing consumables during the performance period must represent at least 5% (by cost) of documented or...

Last reply: Kimberly Schlaepfer, Apr 1, 2015, 1:19 pm