Topic | Recent |
---|---|
water bills received every 3 monthsEBOM-2009 EAp2: Minimum Energy Efficiency Performanceposted by Agnieszka Rylska on May 17, 2016, 8:09 am
Our project receives water bills including water usage every 3 months. Is it acceptable to eneter meter readings and costs in EnergyStar Portfolio Manager tool for a period of 3 months instead of... Last reply: Trista Brown, May 18, 2016, 1:12 pm |
|
parking for fleet vehicleNC-2009 SSc4.3: Alternative transportation - low-emitting and fuel-efficient vehiclesposted by Agnieszka Rylska on Feb 11, 2016, 6:48 am
In my project there are two areas dedicated for parking. One parking lot is designated for fleet vehicles so only workers who drive fleet cars can use it (this parking lot is situated in front of... Last reply: Marilyn Specht, Feb 11, 2016, 12:53 pm |
|
ASHRAE requirements for cooling towersCS-2009 EAp2: Minimum Energy Performanceposted by Agnieszka Rylska on Dec 8, 2015, 5:14 am
As part of this Prerequisite we have to provide cooling towers that comply with requirements of section 6.4 of 90.1-2007 ASHRAE Standard. In Table 6.8.1G there are performance requirements listed... Last reply: Marcus Sheffer, Dec 11, 2015, 10:48 am |
|
Sensors calibration during the performace periodEBOM-2009 EAc3.1: Performance measurement - building automation systemposted by Agnieszka Rylska on Mar 18, 2015, 10:56 am
Is it necessary to calibrate sensors during the performance period even if the manufacturer’s recommended interval didn't pass yet? Or can it only be mentioned in the maintenence plan that the... Last reply: Melissa Kelly, Dec 10, 2015, 10:18 am |
|
No local zoning requirementsNC-2009 SSc4.4: Alternative transportation - parking capacityposted by Agnieszka Rylska on Nov 30, 2015, 9:18 am
Is there an Alternative Complance Path for projects outside the US with no minimum local zoning requirements? Last reply: Trista Brown, Dec 8, 2015, 1:24 pm |
|
Previous coal mine areaNC-2009 SSc5.1: Site development - protect or restore habitatposted by Agnieszka Rylska on Nov 27, 2015, 9:45 am
Is a site which is located on a teritory of a previous coal mine considered perviously developed? Coal mine works were limited only to underground works, the aboveground site was not affected at... Last reply: Tristan Roberts, Nov 27, 2015, 11:53 am |
|
Parking spaces for trucksNC-2009 SSc4.4: Alternative transportation - parking capacityposted by Alicja Bieszyńska on Nov 3, 2014, 9:07 am
My project is a distribution center that serves number of loading trucks every day. Obviously, the site plan includes parking spaces for them. Last reply: Tristan Roberts, Nov 26, 2015, 11:59 pm |
|
pressure drop adjustemnt in the baseline modelCS-2009 EAp2: Minimum Energy Performanceposted by Agnieszka Rylska on Aug 11, 2015, 7:04 am
I have two questiones: Last reply: Marcus Sheffer, Aug 31, 2015, 9:57 am |
|
G3.1.2.8 Design airflow ratesCS-2009 EAp2: Minimum Energy Performanceposted by Agnieszka Rylska on May 6, 2015, 5:18 am
I have a question regarding section G3.1.2.8 of Appendix G. This section says that "design supply airflow rates for the baseline building design shall be based on a supply-air-to-room-air... Last reply: Marcus Sheffer, Jun 11, 2015, 9:37 am |
|
anticipated annual total ongoing consumables purchasesEBOM-2009 MRc1: Sustainable purchasing - ongoing consumablesposted by Agnieszka Rylska on Apr 1, 2015, 9:15 am
In the Reference Guide on page 254 in Table 1. it's written that "Purchases of of ongoing consumables during the performance period must represent at least 5% (by cost) of documented or... Last reply: Kimberly Schlaepfer, Apr 1, 2015, 1:19 pm |