FAQs about EAp2 :

How do I account for computers with multiple monitors on Portfolio Manager?

How should I treat vacant space on Portfolio Manager?

Our building includes a large laboratory space. Can our project benchmark under the Labs21 program?

We have an international project and the space type is eligible for an Energy Star rating. Can we pursue Case 1 to demonstrate compliance given the recently released alternative compliance paths for international projects?

We have a number of buildings on a single campus that we would like to certify at the same time. Is it possible to benchmark the buildings at the campus level?

I have a mixed-use building and am wondering if it is possible to pursue the prerequisite through Case 1. How do we proceed?

We have a building that consists of two attached structures and it’s unclear if we have to consider it a single building or if it should be certified as two separate buildings and benchmarked accordingly. How should we proceed?

How long is an Energy Star label valid to use with a streamlined approach for Case 1?

Our building includes heavy process loads that significantly increase the overall energy use in the building. If we submeter these loads, can we exclude this energy use for benchmarking purposes?

We have installed submeters on our building but the utility bill includes energy use from several other buildings located on the same campus. How do we reconcile this during the LEED review process?

When is it possible to exclude up to 10% of the building from EAp2?

What do I do if the number of building occupants, operating hours, or vacant space changes during the performance period?

If you pursue the streamlined path for an Energy Star label, should the performance period for EAc6 match the 12-month time frame of the label?

View answers »

Forum discussion

EBOM-2009 EAp2:Minimum Energy Efficiency Performance

water bills received every 3 months

Our project receives water bills including water usage every 3 months. Is it acceptable to eneter meter readings and costs in EnergyStar Portfolio Manager tool for a period of 3 months instead of 1 month? Electricity and district heat consumption is monitored monthly so there's a problem only with water readings.

0

You rely on LEEDuser. Can we rely on you?

LEEDuser is supported by our premium members, not by advertisers.

Go premium for $15.95  »

Wed, 05/18/2016 - 17:12

Hi Agata, it depends on what you're trying to accomplish. It's fine to use the bills if you just want to track water use and costs using Portfolio Manager (additionally, there's no water tracking requirement under EAp2 where you've posted this question). However, if you're trying to earn WEc1 you wont be able to use the bills because meter readings have to be taken at least weekly.