Post a question or comment
Filter by location
Forum
Topic
Replies
Recent

How to Model unit heater in Basel & Proposed model following 90.1-2010?

LEED Reviews: Appeals, Design/Construction Submittals, and more
posted by  soham babu  on 

In my Proposed model(Design) I have DOAS with gas heating, VRF Fan coil units & Electric Unit heaters. following ASHRAE-90.1-2010,

1
Thu Mar 8, 2018, 1:59 pm
5
Default Avatar
President
Genesis Design Inc
LEEDuser Basic Member
7 thumbs up
Thu Mar 8, 2018, 1:15 pm

Eligibility - roof areas in the calculations of restored area and activated area

CS-v4 SSc2:Site development - protect or restore habitat
posted by  Ricardo Sá  on 

Dear All,

We are currently working in a project of a retail building with the following characteristics:

0
3
LEED Fellow
7group / Energy Opportunities
LEEDuser Expert
4454 thumbs up
Thu Mar 8, 2018, 9:26 am

IEQp1

NC-2009 IEQp1:Minimum IAQ Performance
posted by  Adi Negara, LEED AP BD+C  on 

Hello, Our project is to build a two-story office building in Indonesia.

11
Thu Mar 8, 2018, 12:48 am

EAp2

CI-2009 EAp2:Minimum Energy Performance
posted by  Steve Zuwala  on 

When listing non-energy star equipment we enter N/A in the Make or model column. This column is also used for Equivalent equipment as well, so the right had part of the form serves two purposes?

3
Wed Mar 7, 2018, 11:16 pm

CHANGING FIXTURES IN THE CONSTRUCTION PHASE

CS-v4 WEp2:Indoor water use reduction
posted by  Belén Valladares López  on 

Hi everybody

We are in the construction phase of a project and the design phase has been already reviewed by USGBC

2
Wed Mar 7, 2018, 6:01 pm

Dual Car Chargers

NC-v4 LTc8:Green vehicles
posted by  Michelle Rosenberger  on 

The reference manual narrative is looking for charging stations "in" 2% of all parking spaces and the online form is definitely looking for a number of spaces being served by charging stations.

1
Wed Mar 7, 2018, 8:54 pm

Biobased materials - Manufacturer declared conformance

CI-v4 MRc4:Building product disclosure and optimization - sourcing of raw materials
posted by  Danna Richey  on 

We have a project on which we're using a large amount of wool, and we'd like to be able to take credit for biobased materials.  Since we're unable to find any

0