Owner's Representative SignNC-v4 EAp3: Building-level energy meteringposted by Sofia Barahona on Dec 14, 2020, 9:42 am
Does the commitment letter be signed by the owner, which appears on the Project Details registered on LEEDOnline? We have a project which all the the decitions and policies are taken by a... Last reply: Sofia Barahona, Dec 14, 2020, 12:52 pm |
|
Future DevelopmentNC-v4 LTc4: Surrounding density and diverse usesposted by Sofia Barahona on Nov 4, 2019, 9:59 am
We are currently working on a project that achieves a combined... Last reply: Chen Shalita, Sep 22, 2020, 3:47 am |
|
100% Greenfield SiteNC-v4 SSc2: Site development - protect or restore habitatposted by Sofia Barahona on Jan 9, 2020, 11:30 am
If we are designing a project on a 100%... Last reply: Marc Mondor, Sep 2, 2020, 7:01 pm |
|
Runoff volume managed for more than leed boundaryNC-v4 SSc4: Rainwater managementposted by Sofia Barahona on May 13, 2020, 5:14 pm
We have a current project, which is the 3rd stage of a data center complex. The fist two stages are already finish and started functioning some time ago. The stormwater management and design was... |
|
Group or single project for WarehouseNC-v4 MPR2: Must use reasonable LEED boundariesposted by Sofia Barahona on Mar 11, 2020, 4:15 pm
We are currently working on a warehouse which has a total of 12,704.13m2, the project consist of a building of storage and operative offices with a total of 12,516.67m2 and a small separate... Last reply: Summer Minchew, Mar 15, 2020, 8:53 am |
|
Automatic Receptacles LEED InterpretationNC-v4.1 EAp2: Minimum Energy Performanceposted by Sofia Barahona on Jan 17, 2020, 8:10 am
We are attempting to work on a project in LEEDv4.1, which in Optimize Energy Performance states that ASHRAE 90.1-2016 mandatory provisions must be met. However we are wondering if the following... Last reply: Sofia Barahona, Mar 6, 2020, 10:59 am |
|
Distribution of preferred parking on mixed-used buildingsNC-v4 LTc8: Green vehiclesposted by Sofia Barahona on Dec 20, 2019, 1:58 pm
Hi, we are working on a Core and Shell project which has mixed uses: offices and commercial. The project has 4 levels of underground parking, there are two levels assigned exclusively for the use... Last reply: Dionisio Franca, Dec 22, 2019, 8:02 pm |
|
Mandatory Provision for Lighting Controls C&SCS-v4 EAp2: Minimum Energy Performanceposted by Sofia Barahona on Oct 14, 2019, 10:00 am
We are currently working on a LEED Core and Shell v4 office building on Santiago, Chile. Regarding the issue of mandatory provisions ASHRAE 90.1-2010, if there is a binding lease or sale... Last reply: Tyler Thumma, Dec 20, 2019, 11:06 am |
|
Setback requirementNC-v4 EAp2: Minimum Energy Performanceposted by Sofia Barahona on Nov 6, 2019, 2:56 pm
Hi, We are working on an office building where some private offices are served by split system. How does the setback requirement is met on these specific HVAC system? Last reply: Sofia Barahona, Nov 7, 2019, 3:39 pm |
|
Ventilation in CorridorsNC-v4 EQp1: Minimum indoor air quality performanceposted by Sofia Barahona on Oct 29, 2019, 12:24 pm
We have a question regarding the ventilation requirements on corridors in order to comply with requirements of Minimum Indoor Air Quality Performance prerrequisite. Do we need to provide... Last reply: Sofia Barahona, Nov 4, 2019, 7:44 am |