Post a question or comment
Location Filters
Filter by location
Forum
Topic
Replies
Recent

BioPreferred products - applicable for disinfectants, metal polish or other products?

EBOM-v4 EQc7:Green cleaning - products and materials
posted by  Amy Marpman  on 

Would a cleaning product that is USDA Certified BioPreferred meet the requirements for EBOM-v4 EQc7 - Green Cleaning products for 'disinectants, metal polish and other products'?  The particul

0

Site Assessment Guidelines

Warehouses-NC-v4 SSc1:Site assessment
posted by  Johnnie Ehrlich  on 

My company is looking into LEED Certification for a new warehouse we want to construct and while looking over the credits, an easy one I thought we could attain was getting a site assessment done.&

1
Fri Nov 20, 2020, 3:03 pm

BD+C Tenant Guidelines

NC-v4 INc1:Innovation
posted by  Stacey Olson  on 

Does BD+C allow for Tenant Guildlines to be allowed as an innovation credit? If yes, what are the requirements?

1
Mon Dec 7, 2020, 1:37 pm

Dedicated Kitchen Exhaust

NC-v4 EQp1:Minimum indoor air quality performance
posted by  colleen soden  on 

We have a low rise (4 story) multifamily residential project considering LEED v4 BD+C in Boston.

4
Sustainable Design Lead
CannonDesign
LEEDuser Expert
379 thumbs up
Wed Nov 11, 2020, 10:59 am

Outside Temperature Adjustment Factor

EBOM-v4.1 EAp3:Energy Performance
posted by  Julie Hendricks  on 

The calculation for determining the outside temperature adjustment factor in the GHG emissions score calculation seems to be missing from the credit langauge, both here at LEEDuser and in the LEED

1
Wed Jun 15, 2022, 9:58 pm
4
Thu Nov 5, 2020, 8:34 pm

How to validate applicability of Tier 2 & 3 RECs

NC-v4.1 EAc5:Renewable Energy
posted by  Joyce Kelly  on 

An organization contracts with a local utility to exclusively purchase energy from renewable sources for 20 yrs.

1
Thu Nov 19, 2020, 6:38 pm

Project relocated to a new site

NC-v4 IPc1:Integrative process
posted by  Sara Goenner Curlee  on 

I have a project that just completed the IP credit requirements before the end of SD, and now finds itself likely needing to relocate to a different site. The proposed new site is about 1

2
LEED Fellow
7group / Energy Opportunities
LEEDuser Expert
4454 thumbs up
Wed Nov 4, 2020, 7:21 pm

Option 1 Path 2 - What's Been Your Experience?

NC-v4 EQc4:Indoor air quality assessment
posted by  Cynthia Kaplan  on 

Hi all,

Show of hands for those that have used Option 1, Path 2, post occupancy flush out:

Do you provide trending data for both phases, or just the preliminary phase?

0

Legal Sources and Responsible Sources

Pilot-Credits MRpc102:Legal Wood
posted by     on 

I'm trying to pursue this Pilot Credit and see that it has to be wood from legal source (100%) and Responsible Sources (70%).

0