Fundamental Commissioning of On-Site Solar Array

NC-2009 EAp1:Fundamental commissioning of building energy systems
posted by  Rachel Williams  on 

I am working on a project that, through a series of contract issues during construction, does not have commissioning documents for the PV array.

2
Principal
Hellmuth & Bicknese Architects
LEEDuser Premium Member
20 thumbs up
Wed May 11, 2022, 6:17 pm

Option 3 - Product Manufacturer Supply Chain Optimization

CI-v4 MRc5:Building product disclosure and optimization - material ingredients
posted by  Edgar Arevalo  on 

Has anyone been able to tackle the third option for this credit, which is not shown in the BPDO calculator?

0

PM-10 Testing

NC-v4 EQc4:Indoor air quality assessment
posted by  Robert Cashins  on 

What method of testing have people used to measure airborne PM-10 dust required as part of V4 IEQ Credit 3.2?

Is real time monitoring acceptable?

0

No Zone 2, Factor Zone 1 BCTR by 2/3?

Pilot-Credits SSpc55:Bird collision deterrence
posted by  Heather DeGrella  on 

I am editing this question to hopefully make it more clear. Our project is hoping to achieve Bird Collision Deterrence. We have a question on the spreadsheet calculations.

3
Sustainable Design Director, Associate Principal
Opsis Architecture
LEEDuser Premium Member
54 thumbs up
Mon May 9, 2022, 4:47 pm

Furniture to include in LEM documentation?

NC-v4 EQc2:Low-emitting materials
posted by  Erica Downs  on 

Under v3, only systems furniture and desk/occasional seating were included.  Under v4/4.1, is ALL (non-permantly installed) furniture now included?  What counts as a piece of furniture?

3
Fri May 6, 2022, 7:18 pm

WE Credit 4 requirement question

Healthcare-v4 WEc4:Water metering
posted by  Nate Maniktala  on 

WE credit 4 Water Metering, requires the following. However our building has at most two of the items on the list and the credit requires five.

3
Mon May 2, 2022, 1:52 pm
1
Wed Apr 27, 2022, 9:31 pm

Non-certified buildings in LEED boundary

NC-v4 MPR2:Must use reasonable LEED boundaries
posted by  marty seese  on 

I have a project that is all new construction. There are 3 buildings on the site. The main building which is what the owner wants to be LEED Certified. Another building is a shed building.

3
Wed Apr 27, 2022, 7:04 pm

NC & CI projects

Pilot-Credits WEpc110:Water Restoration Certificates®
posted by  Sheryl Swartzle  on 

I found the purchasing process for Water Restoration Certificates to be very easy with BEF.  The benefits are easily understood by the clients and on our CI project the cost was very reas

2
Default Avatar
Sustainability Consultant
Steven Winter Associates
LEEDuser Basic Member
0 thumbs up
Wed Apr 27, 2022, 4:31 pm

WEpc115 & CBECS data

Pilot-Credits WEpc115:Whole Project Water Use Reduction
posted by  Steve Loppnow  on 

We found that CBECS data was more conservative than the metered water use for kitchen areas from comp projects in the portfolio.