Forum quick links
Modeling hotel room lighting
NC-2009 EAp2:Minimum Energy Performanceposted by Thomas Leary on
Hello, Current project has both hardwired permanent lighting fixtures and table lamps plugged into switched receptacles in the hotel rooms of a highrise. Per ASHRAE table G3.1 section 6: b.
Calculating % of Finished Floor FloorScore Certified
NC-2009 IEQc4.3:Low-Emitting Materials—Flooring Systemsposted by Patricia Taylor on
I have been pouring over the SCS website for instructions on how to calculate the % of finished floor that is FSC for IEQ 4.3.
IDc1 Innovation - Green Cleaning LEED NC 2009
NC-2009 IDc1:Innovation in Designposted by William Brown on
We received feedback from GBCI that our Green Cleaning Policy lacks "Standard cleaning procedures to protect vulnerable building occupants.
Fire Station water calculations
NC-2009 WEp1:Water Use Reduction—20% Reductionposted by Heather Appell on
I am currently working on a Fire Station that has a total of 18 employees. However, each shift is 24 hours long and it's 6 employees per shift.
Constructive input I hope
posted by Phil Vanderloo on
I'm not sure who might agree or not but it seems to me that breaking up this forum into specific credits for specific LEED categories is not the best approach.
Shared solar array on a campus with separate utility feeds
NC-2009 EAc2:On-Site Renewable Energyposted by Rebecca Bryant on
We are working on a hospitality project that is attempting LEED Gold, and is part of a larger campus.
Certifying a light rail station
NC-v4 MPR3:Must comply with project size requirementsposted by Elizabeth Powers on
I am exploring the point at which a light rail station becomes eligible for LEED certification under LEEDv4. It was slightly clearer in the MPRs for 2009, but not entirely.
New to LEED
CI-2009 IEQc4.1:Low-Emitting Materials—Adhesives and Sealantsposted by Amy Moore on
I am trying to report materials for IEQ Credit 4.1 and am not sure which category my materials are supposed to be reported under.
EApc67 - Energy Jumpstart
Pilot-Credits EApc67:Energy Jumpstartposted by Janet Fick on
I have registered our project for EApc67 - Energy Jumpstart due to the large amount of process energy in our building.
Sustainable Minds Transparency Reports
CI-v4 MRc3:Building product disclosure and optimization - environmental product declarationsposted by Kerry Honsinger on
Are Sustainable Minds Transparency Reports acceptable as EPDs yet?