Forum quick links
Credits in addition to Optimize Energy Performance?
NC-v4 EAc5:Renewable energy productionposted by Dianne Herrin on
Hi - Our solar system is adding two points to our "optimize energy performance" category due to the cost offset.
MPR Supplemental Guidance Clarification
NC-2009 MPR2:Must be a complete, permanent building or spaceposted by Brian Bartholomew on
Regarding MPR2, the "Supplemental Guidance to the Minimum Program Requirements (Revision 2)", on page17 Article III.1) is titled "VERTICALLY ATTACHED, LEED-EB: O&M, AND MAJOR RENOVATION PROJECT
Synthetic grass surfacing
NC-2009 IEQc4.3:Low-Emitting Materials—Flooring Systemsposted by David Browne on
I have an indoor football practice facility under review. The facility consists of a covered football field and a "head house" containing toilets, training rooms, etc.).
Modeling Office Space in an Existing High Rise Building
CI-v4 EAp2:Minimum energy performanceposted by Annie Argento on
We're using eQuest to model a tenant improvement office space, which is about half of one story in a 28 story high rise office building in LA.
Dedicated bike lanes
Schools-2009 SSc4.2:Alternative Transportation—Bicycle Storage and Changing Roomsposted by Phillip Henning on
What is a dedicated bike lane? I have a sidewalk leading to a new elementary school in two different directions. One is approximately 100 feet long from the from the primary access road.
Section 3.10 compliance
CI-2009 EAc1.3:Optimize Energy Performance—HVACposted by Edgar Arevalo on
I'm working on a CI project that we are currently designing VAVs for the floor(s), the main AHUs are not part of the scope of work but they have VFDs.
Air testing related to partial renovation per floor
NC-2009 IEQc3.2:Construction IAQ Management Plan—Before Occupancyposted by Julie Barth on
I have a client who is asking about air testing for an office building renovation project where small parts of each floor will be renovated.
2010 AGMBC v2
posted by Francis Hernández on
We are a GC with primarily Federal Government construction contracts. We have a project that references the 2010 LEED AGMBC v2 and I cannot find it anywhere.
Adding more projects to a Campus
posted by Deborah Lucking on
We have a campus project that has completed Final Design Review. The owner is looking at adding more buildings to the campus, at some point in the future. 1.
Handwatering in lieu of temporary irrigation
NC-2009 WEc1:Water Efficient Landscapingposted by Mickela Pallares on
Has anyone had any experience in submitting handwatering by the landscape maintenance crew for establishment, instead of temporary above ground irrigaiton?