Post a question or comment
Location Filters
Filter by location
Forum
Topic
Replies
Recent

20% Cut Sheet Upload

NC-2009 MRc5:Regional Materials
posted by  Denise Domino  on 

It is my understanding that you need to upload cut sheets for 20% of the cost.

11
Default Avatar
LEEDuser Expert
472 thumbs up
Wed Mar 29, 2017, 3:22 pm

20% product sheets still required?

CI-2009 IEQc4.3:Low-Emitting Materials—Flooring Systems
posted by  Maria Papiez  on 

Hello. I do not see reference in the current version of LEED Online credit forms to upload 20% of product cutsheets.

4
Wed Mar 29, 2017, 2:58 pm

MRc4 steel made outside US, average recycled content

NC-2009 MRc4:Recycled Content
posted by  Debra a. Lombard  on 

has anyone successfully used the 25% default PCRC (post consumer) recycled content # for steel made outside of the US and shipped into the US.

2
LEED-AP BD+C
GREENSQUARE
LEEDuser Expert
261 thumbs up
Tue Mar 28, 2017, 9:30 pm

LEED AP - Homes or BD&C?

Homes-v4 INc2:LEED AP for Homes
posted by  David Ekstrom  on 

Basic credit languages says "LEED AP with a specialty appropriate to the project," which would logically be LEED AP-Homes.

3
founder/principal
Design AVEnues LLC
LEEDuser Expert
8 thumbs up
Mon Mar 27, 2017, 3:49 pm

Green Cleaning

CI-2009 IDc1:Innovation in Design
posted by  H. Group  on 

Credit 1.1 - How can i obtain point for Green Cleaning? What do i need to provide? thank you

5
Director - Green Building Advisory
Colliers International Ltd.
LEEDuser Basic Member
201 thumbs up
Mon Mar 27, 2017, 3:09 pm

Baseline model for storage facility

Warehouses-NC-v4 EAc2:Optimize energy performance
posted by  Jeremiah Crossett  on 

Hi, I am working on a 5 story self storage building in Shoreline WA as the modeler.

5
Sun Mar 26, 2017, 3:35 pm

Weld-Thru Primer

NC-2009 IEQc4.2:Low-Emitting Materials—Paints and Coatings
posted by  Celimar Fournier  on 

Our structural steel subcontractor is currently using a Sherwin Williams Weld-Thru Primer at the shop location. This is for anti-corrosive/rust purposes.

3
LEED-AP BD+C
GREENSQUARE
LEEDuser Expert
261 thumbs up
Mon Mar 20, 2017, 1:58 am

Credits in addition to Optimize Energy Performance?

NC-v4 EAc5:Renewable energy production
posted by  Dianne Herrin  on 

Hi - Our solar system is adding two points to our "optimize energy performance" category due to the cost offset.

2
LEED Fellow
7group / Energy Opportunities
LEEDuser Expert
4459 thumbs up
Fri Mar 17, 2017, 9:55 pm

MPR Supplemental Guidance Clarification

NC-2009 MPR2:Must be a complete, permanent building or space
posted by  Brian Bartholomew  on 

Regarding MPR2, the "Supplemental Guidance to the Minimum Program Requirements (Revision 2)", on page17 Article III.1) is titled "VERTICALLY ATTACHED, LEED-EB: O&M, AND MAJOR RENOVATION PROJECT

2
Integrated Design & LEED Specialist
SERA Architects
LEEDuser Expert
1361 thumbs up
Fri Mar 17, 2017, 5:04 pm

Synthetic grass surfacing

NC-2009 IEQc4.3:Low-Emitting Materials—Flooring Systems
posted by  David Browne  on 

I have an indoor football practice facility under review. The facility consists of a covered football field and a "head house" containing toilets, training rooms, etc.).

4
Default Avatar
Architect
CRA Associates, Inc.
LEEDuser Premium Member
5 thumbs up
Thu Mar 16, 2017, 1:50 pm