Forum quick links
Pilot Credit EApc95 - LEED v2010 MF Midrise
Pilot-Credits EApc95:Alternative Energy Performance Metricposted by Thomas Chase on
We have an MF Midrise project located in Boston, with all-electric VRF systems as a result of advocacy by the City of Boston to electrify buildings.
Other Buildings within LEED Boundary
NC-v4 SSc5:Heat island reductionposted by Max Krueger on
Should other buildings within the LEED boundary be counted towards this credit? These existing buildings will not be getting certified.
Option 2: Inputting Direct and Diffuse Horizontal Irradiance in IES
NC-v4 EQc7:Daylightposted by on
I'm working in IES to evaluate the daylight LEED credit option 2 for a project, and one of the requirements is to input direct and diffuse horizontal irradiance.
ISO 14001 Certified EMS - Innovation Credit?
NC-v4 INc1:Innovationposted by Miguel Rivera on
Reposting this question from LEED 2009. Has anyone received guidance on whether this is an acceptable Innovation credit (ISO 14001 Certified EMS) for LEEDv4 projects?
Process Crop in Open Space Calculations
NC-v4 SSc3:Open spaceposted by Candice Rogers on
Good morning -
Any advantage over v4?
Schools-NC-v4.1 SSc5:Heat Island Reductionposted by Chelsea Miller on
Is there any advantage to replacing this specific LEED v4 credit with LEED v4.1?
Monitoring Based Cx in Specification
NC-v4 EAc1:Enhanced commissioningposted by Rachel Manoguerra on
Our Cx firm has recently been asked to include Monitoring Based Cx language in our standard Cx Spec.
Light Reflectance Values
CI-v4 EQc6:Interior lightingposted by Casey Krieg on
This credit references LRV's for furniture if it is included in the scope of work. In our instance it is and LEED breaks it down further to work surfaces and movable partitions.
MRc5 Option 2
NC-2009 MRc5:Regional Materialsposted by Richard Metts on
Hello to All!
I'm trying to figure the following and see if I am understanding Option 2 of MRc5