Forum quick links
PC 75 Clean Construction
Pilot-Credits SSpc75:Clean constructionposted by Patty Lloyd on
Has anyone achieved this pilot credit yet? And if so were you able to get all of the requirements? I was hoping to see a % of how many projects that attempted this credit achieved it.
Testing Protocol and Training Requirements
Pilot-Credits INpc137:Cleaning and Disinfecting Your Space for Emerging Pathogensposted by Glen Boldt on
Cleanliness Protocols: Wondering if there has been any pushback from Operators/Facility staff on these protocols and the training requirements?
50% Post consumer content
posted by Todd Dayton on
In Class A office most paper available is 30% post consumer content.
Baseline System for Floor Radiant Heating
NC-v4 EAp2:Minimum energy performanceposted by Rajat Wadhwa on
Hi, we are modeling an aquatic center where we have open floors and we are heating the floors with Radiant heating to 84F floor temp, now the floor is being open to enviornment , so in the energy m
VOC limits for concrete curing compound
NC-v4 EQc2:Low emitting materialsposted by Jeff Wiedmeyer on
Does anyone know what the max allowable VOC limit is for a dissipation concrete curing compound? The product data submittal states VOC content is 301 g/L. I read that the USGBC requirem
LEED NCv4: Minimum Energy Performance Prescriptive Path
NC-v4 EAp2:Minimum energy performanceposted by Shashank Singh on
Folks,
Building reuse plus addition
NC-v4.1 MRc1:Building Life-Cycle Impact Reductionposted by Erica Downs on
Can someone please clarify if the entire project (including additions) is used as the "denominator" for this credit? Or only the existing building that is being resused? I am finding th
What Documentation - Specs or Submittals? Cadmium and Lead Paint still an issue for NEW Paint?
Healthcare-v4 MRc6:PBT source reduction - lead, cadmium and copperposted by Heather Ane Zeto on
2 questions in 1!
What documentation are you uploading to meet the credit requirements?
Clarification Needed on Reporting Bus Trips
NC-v4.1 LTc5:Access to Quality Transitposted by on
I’m seeking clarification on a matter related to daily trip reporting for our local transit system. We have multiple buses running simultaneously on certain routes.
5 year replacement period?
CI-v4 EAp3:Fundamental refrigerant managementposted by Laura Charlier on
"For existing buildings with existing equipment or projects that use existing central plants, teams will need to check if CFC-based refrigerants are being used.