LEED CS 2009 - WEp1 & WEc3

CS-2009 WEp1:Water Use Reduction
posted by  Ruel Galve  on 

We are building a mixed use project, Office, Hotel and Residential to qualify for LEED CS 2009 Gold. Only the office core will have toilets that will be built during C & S construction.

1
Tue Aug 4, 2015, 2:29 pm

Job Specific Environment Analysis

NC-2009 SSp1:Construction Activity Pollution Prevention
posted by  Yodi Danusastro  on 

Does anyone has the template of JSEA? I've been ask to create ESC with inclusion of JSEA template. Where an I find this template?

0

Mixed-use Building

CS-2009 SSc9:Tenant Design and Construction Guidelines
posted by  Wan Ji Loo  on 

Hi, my project is a mix use building with two buildings connected via a commercial area below, a residential and hotel in one block and a office tower in the other.

1
Mon Nov 30, 2015, 10:34 pm

Acoustic ceiling & gypsum board

CS-2009 IEQc4.4:Low-Emitting Materials—Composite Wood and Agrifiber Products
posted by  Anna Okviana  on 

Is it enough to comply the credit by submit document from manufacture that state " Formaldehyde is NOT used in the manufacturing of these product" ?

2
Freelance LEED Coordinator
Construction Company
LEEDuser Basic Member
3 thumbs up
Thu Jan 19, 2017, 11:07 am

Parking Garage Demand Controlled Ventilation

CS-2009 EAp2:Minimum Energy Performance
posted by  Scott McMillan  on 

Hi there, When a proposed building model includes parking garage DCV based on CO - How should the control of the baseline model garage fan volume be controlled?.

3
Mon Nov 23, 2015, 2:56 pm

LEED CS 2009 EAc1

CS-2009 EAc1:Optimize Energy Performance
posted by  Ruel Galve  on 

We are currently doing a LEED 2009 CS - GOLD project in Jakarta. The question is: Do we need to select our equipment (pumps and fans) based on the recommended baseline building design power from A

2
LEED Fellow
7group / Energy Opportunities
LEEDuser Expert
4459 thumbs up
Wed Aug 26, 2015, 2:04 am

Categorizing a LEED project

LEED Rating System Selection
posted by  Adi Negara, LEED AP BD+C  on 

Hello all, I have a difficulty in determining the appropriate LEED rating system for a project, and I hope that you all can tell me what rating system is best suited to the project: The project ow

2
Thu Apr 2, 2015, 2:48 pm

Baseline HVAC Model System-8 VAV PFP Boxes with Outdoor Air Unit

NC-2009 EAp2:Minimum Energy Performance
posted by  Ivan Priatman  on 

Dear LEED, We are designing a medical office with VRF system, to fulfill iaq requirements we add independent outdoor air unit comprises of supply and exhaust fans on each zone.

9
Senior Designer
PT. Archimetric
LEEDuser Basic Member
4 thumbs up
Fri Mar 27, 2015, 10:02 am

Synthetic Enamel's VOC

NC-2009 IEQc4.2:Low-Emitting Materials—Paints and Coatings
posted by  Yodi Danusastro  on 

Which one from the table that suits for Synthetic Gloss Enamel paint, that use for painting metals?

3
LEED-AP BD+C
GREENSQUARE
LEEDuser Expert
261 thumbs up
Thu Feb 12, 2015, 4:28 am