Does all of Section 1.6 results have to be filled?
NC-2009 EAp2:Minimum Energy Performanceposted by Ivan Priatman on
Dear LEED, We are trying to achieve points in EAp2 scorecard via Building Simulation Method.
CORE area and SHELL area
CS-2009 IEQc4.1:Low-Emitting Materials—Adhesives and Sealantsposted by Yodi Danusastro on
How to specify the IEQc 4.1 credit area limit for CS in SHELL area? in case for tenant spaces (that is still unoccupied), or the anchor tenant that has construction in parallel.
Project that only Greenfield Exist
NC-v4 SSc2:Site development - protect or restore habitatposted by Yodi Danusastro on
HI, what if at the project site is only Greenfield?
Acoustic ceiling & gypsum board
CS-2009 IEQc4.4:Low-Emitting Materials—Composite Wood and Agrifiber Productsposted by Anna Okviana on
Is it enough to comply the credit by submit document from manufacture that state " Formaldehyde is NOT used in the manufacturing of these product" ?
Parking Garage Demand Controlled Ventilation
CS-2009 EAp2:Minimum Energy Performanceposted by Scott McMillan on
Hi there, When a proposed building model includes parking garage DCV based on CO - How should the control of the baseline model garage fan volume be controlled?.
LEED CS 2009 EAc1
CS-2009 EAc1:Optimize Energy Performanceposted by Ruel Galve on
We are currently doing a LEED 2009 CS - GOLD project in Jakarta. The question is: Do we need to select our equipment (pumps and fans) based on the recommended baseline building design power from A
Categorizing a LEED project
posted by Adi Negara, LEED AP BD+C on
Hello all, I have a difficulty in determining the appropriate LEED rating system for a project, and I hope that you all can tell me what rating system is best suited to the project: The project ow
Baseline HVAC Model System-8 VAV PFP Boxes with Outdoor Air Unit
NC-2009 EAp2:Minimum Energy Performanceposted by Ivan Priatman on
Dear LEED, We are designing a medical office with VRF system, to fulfill iaq requirements we add independent outdoor air unit comprises of supply and exhaust fans on each zone.
Synthetic Enamel's VOC
NC-2009 IEQc4.2:Low-Emitting Materials—Paints and Coatingsposted by Yodi Danusastro on
Which one from the table that suits for Synthetic Gloss Enamel paint, that use for painting metals?