Dear LEED, We are designing a medical office with VRF system, to fulfill iaq requirements we add independent outdoor air unit comprises of supply and exhaust fans on each zone. We employ whole building simulation by comparing our proposed model with baseline model. According to ASHRAE, the baseline for our new building would be System-8 VAV with PFP Boxes. Should we model the identical outdoor air units in the baseline which is independent from its main HVAC system? Or we are allowed to simply include identical outdoor air requirements inside the main HVAC system-8?