Forum discussion

CS-2009 IEQc4.1:Low-Emitting Materials—Adhesives and Sealants

CORE area and SHELL area

How to specify the IEQc 4.1 credit area limit for CS in SHELL area? in case for tenant spaces (that is still unoccupied), or the anchor tenant that has construction in parallel. How far the building contractor need to specify the VOC content? Does ALL the AC ducting sealant, fireproofing, and adhesive need to be documented, even in tenant area? Or this IEQc 4.1 only for CORE (example: elevator lobby, toilets, and building lobby) area?

0

You rely on LEEDuser. Can we rely on you?

LEEDuser is supported by our premium members, not by advertisers.

Go premium for $15.95  »

Mon, 03/30/2015 - 01:17

Hi, would anyone help?

Add new comment

To post a comment, you need to register for a LEEDuser Basic membership (free) or login to your existing profile.