Forum quick links
Emergency fire ventilation fans (motors) - Section 10.4.1
NC-v4 EAp2:Minimum energy performanceposted by Luis Andrade on
Hi,
Rule 1113 and 1168
Homes-v4 EQc7:Low-emitting productsposted by Xavi Ramon on
Can somebody confirm if the limits listed in rule 1168 (adhesives and sealants) and rule 1113 (paints and coatings) will be accepted for wet applied products in LEED v4 EQc7?
Flush-out - Hotel Facility
NC-2009 IEQc3.2:Construction IAQ Management Plan—Before Occupancyposted by Luis Andrade on
Hello,
I'm currently working in a project that is a hotel facility.
LEEDv4 Homes and Multifamily Workbook, Water Reduction Calculato
Homes-v4 WEc1:Total water useposted by Raquel Clemente on
Hello! I am having some trouble to complete de Water Reduction Calculator. The Project is a whole building, being each floor a different dwelling unit.
Subtraction metering in C&S
CS-v4 EAc3:Advanced energy meteringposted by HoMU WELLTECH on
Good morning,
Cross-contamination prevention: dedicated exhaust system still required?
NC-v4 EQc1:Enhanced indoor air quality strategiesposted by Luis Andrade on
Hi,
Construction Work Area Depressurization
NC-v4 EQc3:Construction indoor air quality management planposted by Danilo Ilic on
Does anyone have an example of how construction work area depressurization (in order to create a pressure difference between construction and clean areas)&n
Projects without exterior areas on the grounfloor
NC-v4 SSc3:Open spaceposted by Ricardo Sá on
Dear All,
In case of projects without exterior areas on the grounfloor (LEED Boundary overlap the building footprint), can only balconies counts to achieve open space activation credit?
Prerequisite Required Documentation
NC-v4 EAp3:Building-level energy meteringposted by Danilo Ilic on
What constitutes "Confirmation of permanently instaled meters" in the required documentation part?
Toilets: private or public?
NC-v4 EQp1:Minimum indoor air quality performanceposted by Francesco Passerini on
In a office building that is occupied by a private firm how shall be considered the toilets according to Table 6.4 of ASHRAE 62.1-2010? Private, since the property is private? Does it depend on the