Forum quick links
Exceptional calculation method application.
NC-2009 EAp2:Minimum Energy Performanceposted by FABIO VIERO on
Under ASHRAE 90.1 – G2.5, can we avoid to use a workaround to detail a HVAC system feature which could involve an energy saving, therefore avoid to do an exceptional calculation method, if we prefe
Heat Island Reduction
NC-v4.1 SSc5:Heat Island Reductionposted by Maria Gamero on
Our project has 85% of parking covered by the building, but on the roof we have a vegetated area and solar panels. In the credit of Heat Island Reduction can we opt for Option 1?
LEED v4.1 Service water-heating system with DES purchased heat
NC-v4.1 EAp2:Minimum Energy Performanceposted by Manuel Romera Molina on
Hello everybody,
LEED v4.1 Service water-heating system with DES purchased heat
Hospitality-NC-v4.1 EAp2:Minimum Energy Performanceposted by Manuel Romera Molina on
Hello everybody,
Double-counting non-roof measures
NC-v4 SSc5:Heat island reductionposted by Jacopo Cattaruzzi on
Hi,
3 uses in a single building
posted by Lidia Johansen on
Hi everyone!
We have a single building which will have 9 office floors, 8 hotel floors and 10 multi-residential floors.
Would it be the right approach to asses it under:
impact of green lease clauses
Pilot-Credits EApc159:Green Leases ACPposted by Belén Valladares López on
Dear all
We are drafting a green lease for an office building. Does anyone have experience with the implications of introducing “green” clauses in a commercial lease?
Best
Historical designation and infill site calculation
NC-v4 LTc3:High priority siteposted by Jacopo Cattaruzzi on
Hi,
LTc4 and buildable land
NC-v4 LTc4:Surrounding density and diverse usesposted by Jacopo Cattaruzzi on
Hi,
I am following a project of a hotel complex located in the Italian alps.