Recommended values for Met and CLO and size of zones
NC-v4 EQc5:Thermal comfortposted by Sandra Holmström on
Hi! Is there any recommended value för Met and CLO that you must use when you perform your calculation of PMV/PPD etc? Is there any recommended size of the zones that require thermal comfort Cont
Option 2 - Leadership Extraction Practices - PEFC wood?
CS-v4 MRc3:Building product disclosure and optimization - sourcing of raw materialsposted by Sara Johansson on
Is PEFC wood under Option 2 - Leadership Extraction Practices accepted?
Dual Showerheads
NC-2009 WEp1:Water Use Reduction—20% Reductionposted by Pia Öhrling on
We have a hotel where the showers have two showerheads. One showerhead placed overhead and one han-held showerhead. They have different flow-data.
Very old CI 2009 registered project - can we still certify?
CI-2009 PIf1:Minimum Program Requirementsposted by Eric Thompson on
Hi I'm helping a colleague who has a project that was registered in 2011 for LEED CI 2009 and construction completed / substantial completion in 2011.
Multi-attribute optimization
CS-v4 MRc2:Building product disclosure and optimization - environmental product declarationsposted by Tobias Berge on
Object - LEED v 4 Core & Shell. Sweden. Our goal is Platinum and we find the material credits very challenging.
Rug
CI-2009 IEQc4.3:Low-Emitting Materials—Flooring Systemsposted by Alicia Costas Freire on
Hello, I am working on a project where it is proposed to lay a rug directly on top of the raised floor in some areas.
Transportation Planning Handbook
NC-v4 LTc7:Reduced parking footprintposted by Susannah Goddard on
I don't have a copy of this to hand but need to know the content of Tables 18-2 to 18-4.
Increased ventilation instead of alarms?
NC-2009 IEQc1:Outdoor Air Delivery Monitoringposted by Maria Porter on
I understand that for densely occupied spaces an alarm (visible or audible) is required.
Renewable Energy in CS project
CI-v4 EAc4:Renewable energy productionposted by Sara Johansson on
Is the tenant obliged to install additional renewable energy (or sign ownership/contract for off-site renewable energy) if the CS project fullfills criteria and recieves maximum (3) points?
Peak building users (FTE + Peak Transients)
CS-2009 SSc4.2:Alternative Transportation—Bicycle Storage and Changing Roomsposted by Sara Johansson on
I am working on a LEED v.2009 CS project, using deafault occupancy Core and Shell Appendix 1. I assume that FTE and transients here are average transients?