Forum quick links
EAc1 baseline and proposed systems
NC-v4 EAc2:Optimize energy performanceposted by John McCullough on
The problem I am having is that I have to select a system for the baseline model which is System 7 VAV with Reheat, based on the advise of ASHRAE Table G3.1.1A , however the proposed system for the
WEc2 - Indoor Water - waterflow
NC-v4 WEc2:Indoor water use reductionposted by Lise Dannesboe on
Hi.
No Appliances in the Scope
Hospitality-NC-v4 WEc2:Indoor water use reductionposted by Muge Karasahin on
Hello,
We are currently working on a pod hotel project, where there no laundry or food services within the hotel.Therefore there are no appliances included in the project.
When is the building considered occupied?
NC-2009 EAc3:Enhanced commissioningposted by Lise Dannesboe on
Hi. For the 10 month post-occupancy commissioning - when is the post-occupancy considered started. When all occupants (100%) have moved into the house and all equipment is up and running?
Change to Furniture Evaluation Criteria
NC-v4 EQc2:Low-emitting materialsposted by Ian Thompson on
There was a rating system correction at the end of January http://www.usgbc.org/node/10611490 which seems to reduce the value of a Furniture Evaluation complying to Section 7.6.1 of ANSI/BIFMA e3 –
Painting
CS-2009 SSc7.1:Heat island effect - nonroofposted by Lise Dannesboe on
Hi - is it possible to paint the pavement to get the wanted SRI-value for the non-roof? And is there any specific requirements for such a paint?
BR, Lise
LT c.5 Calculating informal transit trips and weekend trip frequency
CS-v4 LTc5:Access to quality transitposted by Salam Salman on
Hello there,
I am assessing this credit for a new office building and I would be most grateful if you could help me clarify the following items:
2-year contract from what time?
NC-2009 EAc6:Green powerposted by Maria Porter on
I can find no evidence that the 2-year period needs to start as soon as the building is finished, is that the case?