LEED Basement Boundary

Healthcare-v2009 MPR3:Must use a reasonable site boundary
posted by  Patrice McVeigh  on 

Hi, I am working on a project with 3 towers over a shared 2-storey basement. Each tower is being certified separately.

2
Representative
Vermont House of Representatives
LEEDuser Expert
7780 thumbs up
Wed Mar 4, 2020, 10:47 am
1
Tue Jan 28, 2020, 6:14 pm

Under building Parking roof area calculations

CS-v4 SSc5:Heat island reduction
posted by  Timo Rintala  on 

We have had recent guide from USGBC, that also in case of under building parking roof SRI requirements are to be met. Even if there is eight floors of office in between.

1
Tue Mar 3, 2020, 9:57 pm

Open fireplaces

NC-v4 EQp1:Minimum indoor air quality performance
posted by  Cristina Florit  on 

I am working in a hotel project where open fireplaces are being considered.

1
Thu May 26, 2022, 2:42 pm
0

Tenant Guidelines credit substitution to v4?

CS-2009 SSc9:Tenant Design and Construction Guidelines
posted by  Maria Porter  on 

Now that Tenant Guidelines in v2009 are a bit dated, I’m referring to that CI v2009 no longer exists for new projects, wouldn’t it make more sense to use v4 credit requirements instead?

13
Sustainability specialist
Skanska Sweden
LEEDuser Basic Member
205 thumbs up
Thu Jan 23, 2020, 4:10 pm

MDE's simple equation for estimating surface area

CS-v4 SSc4:Rainwater management
posted by  Erkki Seinre  on 

I came across a video about treatment area calculation on USGBC website: 

0

Rc value

NC-v4 EAc6:Enhanced refrigerant management
posted by  Lise Dannesboe  on 

Hi

To caluclate the Rc-value we need to know the amount of refrigerant and the cooliing capacity. As LEED v4 puts it:

3
Project Director
WSP USA
LEEDuser Basic Member
381 thumbs up
Wed Jan 8, 2020, 11:04 am

Exemplary Performance

CS-v4 EAc2:Optimize energy performance
posted by  Maria Porter  on 

Is the Exemplary Performance threshold 54 % for CS as well (like NC?) The leap seems bigger for CS project than for NC Projects, based on that the table ends on 47 % for CS and 50 % for NC, both ac

2
Mon Dec 2, 2019, 2:21 pm
3
Senior Mechanical Engineer
Metec Consulting Engineers
LEEDuser Basic Member
2 thumbs up