Hi,

I am working on a project with 3 towers over a shared 2-storey basement. Each tower is being certified separately. I am trying to define the LEED boundary in the basement to line up with the parking spaces designated to each building. My question is does the LEED boundary in the basement define the project LEED boundary at ground level also? Or can I have a different LEED boundary in the basement than at ground level?