Post a question or comment
Location Filters
Filter by location
Forum
Topic
Replies
Recent

Insulation - option 2 budget calculation method

NC-v4 EQc2:Low emitting materials
posted by  Caroline PIN  on 

Dear all, The guide is not very clear about interior or exterior insulation when we use option 2. Exterior insulation must be included in option 2 calculation for New Construction of offices ?

6
Tue Apr 24, 2018, 10:44 pm

Parking spaces for projects logistics

NC-2009 SSc4.3:Alternative Transportation—Low-Emitting and Fuel-Efficient Vehicles
posted by  Anna Korinkova  on 

Our project is an exhibition center. Do we have to count parking spaces for exhibition logistics (incl. trucks, vans, supply deliveries ets.) into the LEV/FEV calculation? Thanks.

1
Mon Apr 9, 2018, 1:34 pm

90.1 2010: V4: Baseline Lighting Control

NC-v4 EAp2:Minimum energy performance
posted by  Adrien Dumolard  on 

Hello, I work on my first PRM. In the 9.4.1.2 mandatory provisions, the standart say: "The controlled lighting shall have at least one control step between 30% and 70% (inclusive) of full lighting

3
Director
Passive Dynamics Sustainability Consultants
LEEDuser Basic Member
12 thumbs up
Wed Apr 4, 2018, 1:31 pm

Additional requirements - Guarantees of Origin (GOs)

NC-2009 EAc6:Green power
posted by  Jens Apel  on 

The European ACP for EAc6 states: "Guarantees of Origin (GOs) are an acceptable equivalent to the Green-e program for electricity if additional requirements are met with regards to location of powe

3
Mon Feb 19, 2018, 10:29 am
3
Partner
Longman Lindsey
LEEDuser Expert
6 thumbs up
Fri Feb 16, 2018, 11:56 am

EB O+M recertification after renovation

LEED Rating System Selection
posted by  Michael Grafschmidt  on 

An existing office building, LEED EBOM GOLD certified in 2014, is going to be renovated now.

1
Thu Jan 18, 2018, 4:03 pm

Swiss Reference standard for Primary Energy and GHG

Pilot-Credits EApc95:Alternative Energy Performance Metric
posted by  Susann Geithner  on 

Anyone working on a Swiss project I recommend using SIA380, which list the applicable GHG and primary energy values.

0
1
Thu Aug 6, 2020, 1:13 pm

German AgBB in LEED version 3 and 4

NC-2009 IEQc4.3:Low-Emitting Materials—Flooring Systems
posted by  Jens Apel  on 

In a LEED v3 project a manufacturer is supplying information that his carpet is complying with AgBB 2015. For LEED v4 this would be sufficient (as far as I know newer standards are accepted).

0
1
Tue Nov 28, 2017, 4:28 pm