Modeling pump, fan, COP
CS-2009 EAp2:Minimum Energy Performanceposted by Indochine Engineering VN on
Hi, I have many chilled water pumps, 1 primary and 3 loop secondary pumps with heat exchangers.
Heat gain originating from hooded equipment in energy modeling
NC-2009 EAp2:Minimum Energy Performanceposted by Panupant Phapant on
I am doing energy simulations for a factory.
Bamboo Flooring to be considered in certified wood calculations
NC-2009 MRc7:Certified Woodposted by ABDUL MUTHALIB MOHAMED on
We have suggested bamboo flooring in a project for 2000 SFT. Should we include bamboo flooring in Certified wood calculations? Please clarify. Thanks in Advance.
leed ebom- v4: Enhanced indoor air quality strategies
EBOM-2009 IEQc1.2:IAQ Best Management Practices—Outdoor Air Delivery Monitoringposted by VISHESH AGARWAL on
Option 2. Additional enhanced IAQ strategies (1 point) Comply with the requirements of at least one of the following. 1. Filtration for mechanically ventilated spaces 2. Carbon Dioxide Monitors 3.
Rainwater Harvesting - Irrigation and Reclaimed Water?
EBOM-v4 WEc4:Water meteringposted by ARDOR GREEN on
We have an office project that will have some large rainwater collection tanks that will be used for irrigation.
Modeling Software Changing
NC-2009 EAp2:Minimum Energy Performanceposted by Muzamil Rafique on
Hello Marcus, I have question regarding the energy simulation software.
office building
Retail-NC-v4 WEc4:Water meteringposted by Zahid Ahmed on
recently appointed as FM in commercial office building. what to do if we want to go for LEED certification. need details. thank you
Energy modeling for LEED BD+C: Core & Shell
NC-v4 EAp2:Minimum energy performanceposted by Hanh Truong on
Dear all, We have a project targeting LEED BD+C: Core & Shell. My question is how to model whole-building energy simulation?
Exterior lighting design
CI-2009 EAc1.3:Optimize Energy Performance—HVACposted by Sivarajah Ragulakeethan on
Hi, We are working on commercial interior projects. While doing the model we didn't receive exterior lighting design.
Co-processing as an approach to Waste Management
CS-2009 MRc2:Construction Waste Managementposted by Katherine Ann Resurreccion on
Hi All, I would like to hear your opinion about co-processing as an acceptable waste diversion to meet the intent of this credit.