Forum quick links
LE and FE Motorbike Parking
NC-2009 SSc4.3:Alternative transportation - low-emitting and fuel-efficient vehiclesposted by Tim Middleton on
Our project is mixed use (retail, residential, hotel) and has parking for 894 cars and 3089 "2 wheeled vehicles" which will be a mix of bicycles, electric bikes and motorbikes but mostly motorbikes
Project that only Greenfield Exist
NC-v4 SSc2:Site development - protect or restore habitatposted by Yodi Danusastro on
HI, what if at the project site is only Greenfield?
Purchasing RECs for Projects with District Cooling
CS-2009 EAc6:Green powerposted by Katherine Ann Resurreccion on
Hi, we have a LEED 2009 registered Core and Shell project in the Philippines which utilizes district cooling.
Tile finishes for flat roof
CS-2009 SSc7.2:Heat island effect - roofposted by Magda Aghababyan on
We are working project C&S the client need to use white colour ceramic tile on roof top.Should need to test it ? and value has to be more than 78 for the flat roof ?
Blind
CI-v4 EQc5:Thermal comfortposted by Ameet AA on
Hi, Can blind be considered as control for thermal comfort? Thanks.
District Co generation Plantby
EBOM-2009 EAp2:Minimum energy efficiency performanceposted by satheesh M on
Hi, The building is catered by own chiller plant located in the building & building owned DES Cogeneration plant for the space cooling.
Storm water calculation
CS-2009 SSc6.1:Stormwater design - quantity controlposted by Magda Aghababyan on
Hi, We are working in project previously land was empty top soil is hard and when calculating Pre-development
100% outdoor air indirec evaporative cooling system
NC-2009 EAp2:Minimum energy performanceposted by BEE Incorporations on
Hi everybody, The project is a garment factory. We are modeling a 100% outdoor air IEC system for the proposed case. And the system 8 (VAV with PFP Boxes) is modeled in the baseline case.
Project size extended in the middle of construction
NC-2009 MPR4:Must comply with minimum floor area requirementsposted by wachira sosaeng on
My project registered for LEED 2009, mixed use building with 2 towers on the same podium.
Alternative HVAC duct sealant
NC-2009 IEQc3.1:Construction IAQ management plan - during constructionposted by John Covello on
Hi, My contractor is proposing and alternative method to sealing the air conditioning ducts. They would like to use a foam for the duct end that would be air tight.