Forum quick links
All water reduction through recycling
NC-2009 WEc3:Water use reductionposted by Melissa Merryweather on
I'm just curious if anyone has experience not even achieving the basic 20% reduction with the sanitary ware, but then achieving innovation points on both WEc2 and WEc3 (and of course the regional p
Nee of a fire suppression system
NC-2009 EAc4:Enhanced refrigerant managementposted by Magda Aghababyan on
Hi all, Currently we are working on a project which does not have a fire suppression system, but is trying to achieve "Enhanced refrigerant management" credit in LEED NC 2009. In the LEED online fo
Acoustic performance
Data-Centers-NC-v4 EQc9:Acoustic performanceposted by neeraj arora on
How to calculate composite STC for a room?
Can I select my building as "Healthcare" in Portfolio Manager?
EBOM-2009 EAp2:Minimum energy efficiency performanceposted by Amornchai Challcharoenwattana on
My building is a licensed hospital and we are trying to be certified in the category of LEED Existing Building O&M as Healthcare option is not available in LEED V.3.
Glare control device simulation - Option 2
NC-v4 EQc7:Daylightposted by Hanh Truong on
Dear all, I am targeting the Daylight credit by modelling based on Option 2. However, the simulation results show that the illuminance level over the threshold (3,000 lux).
Weekly Log
EBOM-v4 WEc4:Water meteringposted by Kristina Pobre on
Is there a minimum number of logs required to be submitted to comply with this credit? The project I am handling wishes to install the meter but because of the log requirement, we might need to de
LEED CS 2009 - WEp1 & WEc3
CS-2009 WEp1:Water use reductionposted by Ruel Galve on
We are building a mixed use project, Office, Hotel and Residential to qualify for LEED CS 2009 Gold. Only the office core will have toilets that will be built during C & S construction.
Open Plan office served by 4 AHUs
CI-2009 IEQp1:Minimum indoor air quality performanceposted by Michael Wahjudi on
Hi all, we received comments from reviewer that requesting the system computation should be separated for each system. Our development consists of few meeting rooms and open plan offices.
EBOM V4- IPM
Hospitality-EBOM-v4 EQc9:Integrated pest managementposted by VISHESH AGARWAL on
For Pursing the option-1. In house IPM Policy: is it mandatory to use the SF Tier-III Pesticide or use government approved pesticide.
Probability distribution of annual PV production.
NC-2009 EAc2:On-site renewable energyposted by Indochine Engineering VN on
Hi, a solar PV consultant gave me an output of their simulation, in which show probability distribution diagram of Solar PV production.