Forum quick links
LEED Certification
posted by Keerthi Ratnayake on
Hi!
ID for Smart Home System
NC-2009 IDc1:Innovation in Designposted by Tim Middleton on
Our project is mixed use, roughly 1/3 retail, 1/3 residential and 1/3 hotel. We want to apply for Innovation for the use of Smart Home systems in the residential part.
Software's for International Use
NC-v4 MRc1:Building life-cycle impact reductionposted by Aqrab Ali Rana on
Kindly advise on software which can be used in Pakistan, their cost and complexity of use.
Energy Modeling Necessity
NC-v4 EAp2:Minimum energy performanceposted by Nandana Kumar on
We have a project space where the built up area is 2 lakh sqft out of which the conditioned space is 1000 sqft. Is energy modeling necessary in this scenario?
Leeds case study
posted by Rudrabir Ghanti on
Dear All, I am currently studying Green buildings as a part of my curriculum at premier engg institute ,IIT-Delhi in india where I have been given an assignment to do an analysis of leeds certfica
Mixed-use Building
CS-2009 SSc9:Tenant Design and Construction Guidelinesposted by Wan Ji Loo on
Hi, my project is a mix use building with two buildings connected via a commercial area below, a residential and hotel in one block and a office tower in the other.
Energy Submetering
EBOM-v4 EAc5:Advanced energy meteringposted by VISHESH AGARWAL on
I am working on EB Project in LEED V4. In V4 the advance sub-metering is required 1. Chilled water System: Chiller and Chilled water pumps 2.
Lighting Control
EBOM-2009 IEQc2.2:Controllability of Systems—Lightingposted by VISHESH AGARWAL on
I am working on the project where whole building have occupancy sensor. does need to install 50% of the multi occupant space have lighting control by dimmer.
Exhaust Requirement
NC-2009 IEQp1:Minimum IAQ Performanceposted by SAMY Chamy on
I think this credit is for fresh air requirement. Is there any requirement for Exhaust rates, are they need to documented for this credit Our project have store rooms as per local Fire and safety