Basement That Extends to Plot line
NC-2009 WEc1:Water efficient landscapingposted by Omar Elrawy on
Hi, My project has two levels basement that extends to the land's plot line, while the above-grade floors are much smaller areas than the basement area.
CxA role
NC-2009 EAc3:Enhanced commissioningposted by Abdulla Anwar on
Can you advise the CxA role if it was a part of Owner organization? .......................... by the way what is the commissioning developed plan CxP?
Concrete as Temp barriers
NC-2009 MRc2:Construction waste managementposted by Ahmad Gabir on
Hi , We are working on Mega project is Saudi Arabia where we are using the concrete waste to build Safety road/excavation barriers which will be used on site during construction instead of purchasi
DEC - EBOM
EBOM-2009 WEc4:Cooling tower water managementposted by babu rajendran on
My project getting chilled water from District energy center which has cooling towers.
Reduced Parking Footprint Calculation
NC-v4 LTc7:Reduced parking footprintposted by Sefa Sahin on
The project building is gallery, museum. Museum category is not included in the Table - Base Ratios for parking spaces, by building type. What is the best option for calculation it?
LEED Group C&S - Applicable Cooling source in Propose case
CS-v4 EAp2:Minimum energy performanceposted by Ashraf Ali Khan Khan on
I am modelling for LEED GROUP - v4 BD+C: CS. Project has 40 Office buildings shared with same basement and served with multiple Water Cooled Chillers as cooling source.
Gypsum board recycling resource, Saudi Arabia
NC-2009 MRc2:Construction waste managementposted by Shreepad Bandagi on
Wondering if anyone would have a resource for gypsum board recycling anywhere in Saudi Arabia. Thanks!
Concerning Underground Basements
NC-2009 SSc6.1:Stormwater design - quantity controlposted by Omar Elrawy on
Dear all, My project is two underground basement parking floors, that are built on the total land area, while the above-grade floors are built on 30% of the total land area. Should I
Duct Seal level
NC-2009 IEQc4.1:Low-emitting materials - adhesives and sealantsposted by Sarfaraj Khan on
Minimum duct seal level must comply with table 6.4.4.2A- Ashrae 90, i have this in my specification for duct and i think it apply only to G.I Duct, Not to pre insulated duct, please anyone can clar
Number of IAQ samples required ?
NC-2009 IEQc3.2:Construction IAQ management plan - before occupancyposted by Michael Boyle on
Our project consists of (5 townhouse + multipurpose room). This is considered as one building.