Schedule for Lighting, Occupancy, & Plug Loads
NC-v4 EAp2:Minimum energy performanceposted by junaid naseer on
We are working on a Hospital Project outside USA and we are going though option 1 i.e. whole building energy simulation.
Stormwater Management Plan
NC-2009 SSc6.2:Stormwater Design—Quality Controlposted by Nisreen Alhussein on
I cant find clear cut for Stormwater Management Plan definition, i mean is it using both structural and non structural plans to achieve stormwater quality control?
Exhaust fan for chemical storage
CI-2009 IEQc5:Indoor Chemical and Pollutant Source Controlposted by Yaser Al Sharif on
If We have chemical storage room with 69.4 ft square in Area in our building , i want to install one exhaust fan for this room to acheive credit requirements , how can i calculate minimum pressure
Public use vs Building occupant use
CS-2009 SSc4.4:Alternative Transportation—Parking Capacityposted by Dina Ammar on
In a C&S office building, the owner has provided just enough parking spaces in the basement to the building tenants to meet the local zoning minimum requirements.
Decorative Lighting
CI-2009 EAp2:Minimum Energy Performanceposted by Yaser Al Sharif on
Dear All, I have three questions: - We are applying for a commercial interior project, we received our final review (after prem. review) I received a new comment that wasn't mentioned in a prem.
Heat Recovery Counts?
CS-2009 EAc2:On-site Renewable Energyposted by Dina Ammar on
Hello, Will the energy harvested from a heat recovery equipment installed on a chiller and/or the fresh air system in our project count towards on-site renewable energy?
Pressure loss calculation
CI-2009 EAc1.3:Optimize Energy Performance—HVACposted by Yaser Al Sharif on
We are registed for commercial interior rating system , the system installed in our project is vrv system, in order to comply with optimize energy performance EAC1.3 , critical path supply duct pre