Duct Seal level
NC-2009 IEQc4.1:Low-Emitting Materials—Adhesives and Sealantsposted by Sarfaraj Khan on
Minimum duct seal level must comply with table 6.4.4.2A- Ashrae 90, i have this in my specification for duct and i think it apply only to G.I Duct, Not to pre insulated duct, please anyone can clar
Number of IAQ samples required ?
NC-2009 IEQc3.2:Construction IAQ Management Plan—Before Occupancyposted by Michael Boyle on
Our project consists of (5 townhouse + multipurpose room). This is considered as one building.
EAc1 points using DES Option 1 + A lot of Renewables
NC-2009 EAc1:Optimize Energy Performanceposted by Reniel Barroso on
We have a project opting to get the maximum 19 credit points in EAc1.
An example of a ducument for Prerequisite 2
ND-Plan-v4 SLLp2:Imperiled species and ecological communitiesposted by oko Yael on
Hello Eliot, We are in a process of preparing the prerequisites documents for the first LEED ND project in Israel. All other prerequisites are technically clear. Prerequisite 2 is somehow softer.
Cnstrctn began with no LEED intent nw thy wnt rsume seeking LEED
NC-2009 SSp1:Construction Activity Pollution Preventionposted by Aly Adel on
Hello! We have a project that started construction some time ago, and stopped 1 yr ago, leaving only phase 1 (concrete slabs only).
Sea Water Cooled Chiller Modeling
NC-v4 EAp2:Minimum energy performanceposted by Sefa Sahin on
Dear All, Our project building is located in Istanbul/Turkey. Cooling will be provided by centralised two chillers. There is not a cooling tower.
OPR for LEED ND
posted by Philippa Cameron on
Looking through the requirements of LEED ND v4 I can only find reference to the OPR in one location - embedded within Appendix 4 as a requirement for GIB prerequisite Minimum Building Energy Perfor
Minimum Indoor Air Quality Performance Calculation
NC-v4 EQp1:Minimum indoor air quality performanceposted by Amal Venugopal on
My Project has one FAHU on roof which is supply treated Fresh air to all AHU"s, And each AHU further supplies the mixture of outdoor air and Recirculated air to various zone via VAV (no reheating,
voc for Damp proofing paints under ground
NC-2009 IEQc4.2:Low-Emitting Materials—Paints and Coatingsposted by soha yamani on
Hi all , do damp proofing paints that are used to paint concrete foundations, retaining walls, and column necks are considered inside the building ?
Residential Core & Shell
posted by soha yamani on
Hello all I am working on a project that consists of 12 residential buildings with 3 prototypes each prototype has 4 identical residential buildings ( 5 stories each) however the owner will comp