Forum quick links
Biophilic Design: Quantifiable Metrics
Pilot-Credits EQpc123:Designing with Nature, Biophilic Design for the Indoor Environmentposted by LEED Team DC on
Hi, I'm wondering if there are shareable examples of a project team documenting quantifiable biophilic metrics.
Exemplary Performance
NC-v4.1 EQc4:Indoor Air Quality Assessmentposted by Peter Downar on
The BD+C v4.1 guide states that "Exemplary performance is available for projects that test for the additional target volatile organic
Requirement for sequence of operations for systems not part of a BAS?
EBOM-v4.1 EAp1:Energy Efficiency Best Management Practicesposted by Stephen Ward on
Are we required to submit a sequence of operations for HVAC systems that are not part of the building's automation system?
Adding a Level to a LEED O&M Certified Building
posted by Patty Lloyd on
I was asked to create a LEED CS Scorecard for a project that is an addition of a floor added to the top of an existing multi-story LEED O&M certified building.
Soil stockpiling over the winter
NC-v4 SSp1:Construction activity pollution preventionposted by Scott Beckman on
We have a correctional project where we are doing some of the sitework now but the project work will be paused over the winter.
Weekend trip counts for Office Location
CS-v4 LTc5:Access to quality transitposted by Andy Rhoades on
Hi there,
Project pertaining to only the third floor of a building
CI-v4 EAc2:Optimize energy performanceposted by Peter Downar on
- The project pertains to a fit-up of only the 3rd floor of a multi-floor building.
Greenguard for plywood
NC-2009 IEQc4.4:Low-Emitting Materials—Composite Wood and Agrifiber Productsposted by Erin Holdenried on
IS Greenguard certification plus an attestation from the manufacturer that there is no formaldehyde acceptable for plywood products?
Areas of ballasted roof counted, provided that SRI number is high enough?
NC-v4 SSc5:Heat island reductionposted by Martin Smith on
Hey friends,