Post a question or comment
Location Filters
Filter by location
Forum
Topic
Replies
Recent

Meters on closed-loop hydronic system makeup water

Healthcare-v4 WEc4:Water metering
posted by  Mark Benson  on 

Many healthcare projects have closed-loop hydronic systems for chilled water and heating hot water.  Would providing separate meters for chilled water make-up and hot water make-up count as tw

0

Separate measurement of cold and hot lines for healthcare water uses

Healthcare-v4 WEc4:Water metering
posted by  Mark Benson  on 

For healthcare projects, projects must "install water meters in any five" water uses listed.  However, many of these water uses, such as dietary, laundry, laboratory, etc.

0

Furniture reuse

CI-v4 MRc4:Building product disclosure and optimization - sourcing of raw materials
posted by  Marie Miller  on 

Hello - I'm working on a TI project and the client is reusing over half their furniture. I know I include this in the calculator, but do I use the value of the furniture when it was purchased?

1
Thu Apr 27, 2023, 1:49 pm

Do non-contiguous habitat areas qualify?

NC-v4.1 SSc2:Protect or Restore Habitat
posted by  Jennifer Rennick  on 

We are working on a 4-acre site with multiple buildings that aims to landscape with natives as much as possible.

0

Lights mounted under a photovoltaic canopy

CS-v4 SSc6:Light pollution reduction
posted by  Samuel Calhoun  on 

Hi. A project I am assessing has a photovoltaic canopy that covers roof parking. Do the lights under this canopy need to be included in the BUG assessment?

0

LEED Timeline / Schedule

LEED v4.1 Discussion Forum
posted by     on 

Hello! Is there a timeline of when certain credits need to be completed or started during the interior design of a project? 

Thanks

0

Advanced Metering for district cooling

NC-v4 EAc3:Advanced energy metering
posted by  Camilo Velez  on 

Hi all,

We have encountered a peculiar situation in our project due to a couple of factors:

6
LEED Fellow
7group / Energy Opportunities
LEEDuser Expert
4458 thumbs up
Wed Apr 19, 2023, 4:05 pm

No smoking signage without words

NC-v4 EQp2:Environmental tobacco smoke control
posted by  Heather Belsey  on 

I'm working on a healthcare project where the client is planning on using just the no smoking symbol on the door with no words or 'language' attached.  Just the cigarette crossed out - Is this

2
Managing Partner
Ecoimpact Consulting
LEEDuser Expert
171 thumbs up
Mon Apr 17, 2023, 6:30 pm

HPD Disclosure Threshold

NC-v4.1 MRc4:Material Ingredients
posted by  Gretchen Krumm  on 

LEED manual clearly says that an HPD must report ingredients at or above 0.1% for compliance with Option 1.

4
Default Avatar
LEEDuser Premium Member
1 thumbs up
Sun Apr 16, 2023, 10:20 am