One Tenant - two spaces across a public corridor - can this be certified as one project?
CI-v4 MPR2:Must use reasonable LEED boundariesposted by Helen Kessler on
The tenant is located in a large multi-tenant building and has two leased spaces which are separated by a public corridor. Seems to me this is no different from a tenant that is on multiple l
EPD Stud - Separate products count towards 20+ goal under 1 EPD
NC-v4 MRc2:Building product disclosure and optimization - environmental product declarationsposted by Allison Para on
Hello LEED Pros,
Make Up Air Units Modeling Requirements (System or Process Load) - ASHRAE 90.1-2010
NC-v4 EAp2:Minimum energy performanceposted by Richard Tran on
Hello,
Water Heater Efficiency per Table 7.8 of ASHRAE 90.1-2010
NC-v4 EAp2:Minimum energy performanceposted by Richard Tran on
Hello,
Waste management plan submission with multiple GC's
NC-v4 MRp2:Construction and demolition waste management planningposted by Blake Weaver on
I am working on a multiphase project where each phase has dramatically different scopes of work for the project and each has a different GC.
Public park adjacent to the project boundary
NC-v4.1 SSc3:Open Spaceposted by Eslam Elshorbagy on
Hello,
owner occupied area only?
NC-v4 EAc7:Green power and carbon offsetsposted by Alfonzo Collins on
I'm working on a residential building with about a dozen apartments and limited common area. The apartments have their own utility meters, sand ownership has no ability to read those meters (
UPS rooms for LEED
CS-v4 EAp2:Minimum energy performanceposted by Rajat Wadhwa on
Hi, I am working on a Data Center and I am confused if we should model UPS rooms for LEED and what schedule should I use since its a backup supply room incase the power goes .
Modeling UPS Room for Data Center
NC-2009 EAp2:Minimum Energy Performanceposted by Rajat Wadhwa on
Hi, I am working on a Data Center and I am confused if we should model UPS rooms for LEED and what schedule should I use since its a backup supply room incase the power goes .
UPS rooms for LEED
NC-2009 EAp2:Minimum Energy Performanceposted by Rajat Wadhwa on
Hi, I am working on a Data Center and I am confused if we should model UPS rooms for LEED and what schedule should I use since its a backup supply room incase the power goes .