One Tenant - two spaces across a public corridor - can this be certified as one project?

CI-v4 MPR2:Must use reasonable LEED boundaries
posted by  Helen Kessler  on 

The tenant is located in a large multi-tenant building and has two leased spaces which are separated by a public corridor.  Seems to me this is no different from a tenant that is on multiple l

4
President
HJKessler Associates
LEEDuser Basic Member
41 thumbs up
Wed Jan 3, 2024, 1:25 pm
6
Sustainable Design Lead
CannonDesign
LEEDuser Expert
379 thumbs up
Tue Jan 2, 2024, 6:38 pm

Waste management plan submission with multiple GC's

NC-v4 MRp2:Construction and demolition waste management planning
posted by  Blake Weaver  on 

I am working on a multiphase project where each phase has dramatically different scopes of work for the project and each has a different GC.

1
Wed Apr 17, 2024, 1:00 am
1
Wed Jan 3, 2024, 7:05 pm

owner occupied area only?

NC-v4 EAc7:Green power and carbon offsets
posted by  Alfonzo Collins  on 

I'm working on a residential building with about a dozen apartments and limited common area.  The apartments have their own utility meters, sand ownership has no ability to read those meters (

3
Wed Dec 20, 2023, 4:34 pm

UPS rooms for LEED

CS-v4 EAp2:Minimum energy performance
posted by  Rajat Wadhwa  on 

Hi, I am working on a Data Center and I am confused if we should model UPS rooms for LEED and what schedule should I use since its a backup supply room incase the power goes .

 

1
Tue Dec 19, 2023, 8:13 pm

Modeling UPS Room for Data Center

NC-2009 EAp2:Minimum Energy Performance
posted by  Rajat Wadhwa  on 

Hi, I am working on a Data Center and I am confused if we should model UPS rooms for LEED and what schedule should I use since its a backup supply room incase the power goes .

 

3
Tue Dec 19, 2023, 5:16 pm

UPS rooms for LEED

NC-2009 EAp2:Minimum Energy Performance
posted by  Rajat Wadhwa  on 

Hi, I am working on a Data Center and I am confused if we should model UPS rooms for LEED and what schedule should I use since its a backup supply room incase the power goes .

 

1
Tue Dec 19, 2023, 5:19 pm