Forum quick links
How to report High COP values for Chillers
NC-v4 EAp2:Minimum energy performanceposted by Rajat Wadhwa on
Hi I am working on a Data Center in Chicago, and we have Chillers which have a high COP when the ambient temperature is low outside, so The energy modeling software that I am using can ony get as h
Purchasing Policy Prerequisite
EBOM-v4.1 MRp1:Purchasing Policyposted by Sean Smith on
I'm working on a project where the property manager told us the only on-going purchases for the buliding are cleaning supplies (brooms, garbage bags, gloves) and all other purchases are t
How to tell if the chemical inventory of a product is disclosed to 0.1% (1000ppm)
NC-v4 MRc4:Building product disclosure and optimization - material ingredientsposted by Ashley Hu on
Hello there,
Option 1 accepts the following as documentation:
LEED O+M v4 Warehouses and Distribution Centers
posted by Ralph Bicknese on
We are evaluating utilizing LEED O+M for Warehouses and Distribution Centers for a 1.5M sf Distribution Center where the all parties are very interested in being able to achieve a LEED rating and r
Hiring - LEED Project Administrator
posted by Trisha Highnote on
Rennell Associates, LLC, is seeking a candidate to join our team as LEED® PROJECT ADMINISTRATOR.
Mastic
NC-v4.1 EQc4:Indoor Air Quality Assessmentposted by Michelle Lockert on
Can anyone tell me if it is okay to utilize mastic “outside” the building envelope?
Thank you.
Pilot-Credits EQpc57: Enhanced acoustical performance - exterior noise control
Pilot-Credits EQpc57:Enhanced acoustical performance - exterior noise controlposted by Olawale Taiwo on
Hello Sound & Acoustic Specialist (LEED APs),
Please I need a quick confirmation on this Pilot credit EQpc57.
View Type 1 with non-continuous window glazing
NC-v4 EQc8:Quality viewsposted by Edgar Arevalo on
I have a library that has a reading area with windows surrounding all sides but are separate by the interior wall, which makes the glazing non-continuous. The wall space between windows are a
"Weighted sum of non-roof and roof measures" Issue
NC-v4 SSc5:Heat island reductionposted by Edgar Arevalo on
Under the Summary of Heat Island Reduction Measures, the footnote says "Weighted sum of nonroof and roof measures must be greater than or equal to sum of project paving and roof area for 2 points."